My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU-2601331
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
10910
>
2600 - Land Use Program
>
SU-2601331
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2026 3:19:33 PM
Creation date
6/2/2026 4:07:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU-2601331
PE
2631 - ADMINISTRATIVE USE - MINOR (A)
STREET_NUMBER
10910
Direction
N
STREET_NAME
STATE ROUTE 99
City
LODI
Zip
95240
APN
05926062
CURRENT_STATUS
Closed - Issued
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
Site Address
10910 N STATE ROUTE 99 LODI 95240
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�Lc Wo <br /> Saw PWW4H e—Nel, <br /> Working,for You <br /> 1) An encroachment permit shall be required for all work within road right-of-way. (Note: <br /> Driveway encroachment permits are for flatwork only— all vertical features, including but <br /> not limited to fences, walls, private light standards, rocks, landscaping and cobbles are not <br /> allowed in the right-of-way.) (Development Title Sections 9-607.020 and 9-607.040) <br /> 2) A Caltrans encroachment permit shall be required for all work within Caltrans right-of-way. <br /> A copy of the permit shall be submitted to Public Works for the file. <br /> 3) Prior to issuance of the occupancy permit, the driveway approach in the Caltrans right-of- <br /> way shall be improved in accordance with Caltrans requirements. <br /> 4) The Traffic Impact Mitigation Fee shall be required for this application. The fee is due and <br /> payable at the time of building permit application. The fee will be based on the current <br /> schedule at the time of payment. The fee shall be automatically adjusted July 1 of each <br /> year by the Engineering Construction Cost Index as published by the Engineering News <br /> Record. (Resolutions R-00-433) <br /> 5) The Regional Transportation Impact Fee shall be required for this application. The fee is <br /> due and payable at the time of building permit application. The fee will be based on the <br /> current schedule at the time of payment. (Resolution R-06-38) <br /> 6) A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> SR:GG <br /> SKJOAQUIN <br /> COUNTY <br /> Greatness grows here. <br />
The URL can be used to link to this page
Your browser does not support the video tag.