Laserfiche WebLink
Underground Storage Tank <br /> Release Detection Equipment Testing Report Form <br /> 6. SENSOR TEST RESULTS <br /> ❑ Check this box if Appendix 5.1 continuation page is attached. <br /> List only sensors tested. List "Sensor ID"as labeled in system programming. For VPH monitoring, <br /> continuity must be confirmed between the most distant points in the interstitial space to the extent <br /> practical as approved by the Unified Program Agency and the sensor that monitors the zone. <br /> Sensor Sensor Function Continuity <br /> ID Model Component(s) Monitored pass Fail Pass Fail NA <br /> L1 208 DSL STP 0 ❑ ❑ ❑ ❑ <br /> L2 407 DSL ANNULAR 0 ❑ ❑ ❑ ❑ <br /> L3 208 DSL DISP 0 ❑ ❑ ❑ ❑ <br /> L4 208 GAS STP IZI ❑ ❑ ❑ ❑ <br /> L5 407 GAS ANNULAR 0 ❑ ❑ ❑ ❑ <br /> L6 208 GAS DISP 0 ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> Describe all answers marked "No"or "Fail"and the proposed remedy in Section 8. <br /> List all equipment either replaced or repaired (including cleaning or adjustment) in Section B. <br /> Page 3 of 6 <br />