Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> UST Monitoring Site Plan <br /> Site Address- KNIFE RIVER 655 CLAY STREET STOCKTON CA 95206 <br /> KEV I-5 HIGHWAY <br /> A-ANNULAR <br /> F=FILLS <br /> T=TURBINE. . . . . . . <br /> P=PROBE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> V=VAPOR <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I . . . . . . . . <br /> X-SUMPSENCOR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> 1.=leak Detector . . . . . . . . . . . . . . . . . . . SK . . . . . . . . . . . . . . . . . . . . . . . <br /> M Manway . . . . . . . . . . . <br /> B=Brine Sensor .20K. . . . . O . . . . . . . . . . . . . . . . . <br /> 1-Smart Sensor <br /> SeSTP 0 O <br /> C m Floats&Chains <br /> E=E Stop <br /> . O . . . . . . . . . . . . . . . . . <br /> F O <br /> H_HIGH FLOW. . . . . . . . . . . . . . . . . g,7 . . . . . . . . . . . . . <br /> S=SUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> DIE. . . . . . . . . . . . . . . . . . . . . . . . . <br /> 0 . . . <br /> B r. <br /> 2 <br /> DSL. . . . . v . . . . . . . . <br /> *PIPING <br /> (ARROWS) . . . . . . . . . . . . . . . . . . . . <br /> Drawing of piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> exit of sump and . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> UDC's.No . . . . . . . SUICTION LINE. . . . . . . . . . . . . . . . . . . . . . . . . <br /> underground . . . . . . <br /> Drawing is accurate. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Tts <br /> we cannot . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . _ <br /> speculate blue . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> n <br /> prints. . . . . . . . . . . . . . . . . . . . . . <br /> HI FLOW LIN la,_ ❑ <br /> WATER COOLER <br /> is5i DIE HIGH PUMP . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . �.-r. .To Clay Street Entrance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> Any items underground that are not visible to the certifying technician are a professional opinion only end are soleh for informational <br /> Purposes. Drawing not to <br /> Date map was drawn:7/30121 <br /> Instructions <br /> i <br /> i <br /> If you already have a diagram that shows all required information,you may include it,rather than this page with your Monitoring System Certification. On your site plan <br /> show the general layout of tanks and piping. Cleady identify locations of the following equipment.It installed:monitoring system control panels.sensors monitoring tank <br /> annular spaces.sumps dispenser pans,spAl containers,or other secondary containment areas;mechanical or electronic line leak detectors:and in-tank liquid level <br /> ` probes(if used for leak detection). In the space providei.note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 3 of! 2 21'07 <br /> Page 6 of 6 <br />