Laserfiche WebLink
Underground Storage Tank <br /> Release Detection Equipment Testing Report Form <br /> 6. SENSOR TEST RESULTS <br /> ❑ Check this box if Appendix 5.1 continuation page is attached. <br /> List only sensors tested. List "Sensor ID"as labeled in system programming. For VPH monitoring, <br /> continuity must be confirmed between the most distant points in the interstitial space to the extent <br /> practical as approved by the Unified Program Agency and the sensor that monitors the zone. <br /> Sensor Sensor Function Continuity <br /> ID Model Component(s) Monitored pass Fail Pass Fail NA <br /> L-1 208 91 STP 0 ❑ ❑ ❑ ❑ <br /> L-2 208 87-1 STP 0 ❑ ❑ ❑ ED <br /> L-3 208 87-2 STP 0 ❑ ❑ ❑ 0 <br /> L-4 208 DIESEL STP 0 ❑ ❑ ❑ 0 <br /> L-5 420 91 ANNULAR 0 ❑ ❑ ❑ 0 <br /> L-6 420 87-1 ANNULAR 0 ❑ ❑ ❑ 0 <br /> L-7 420 87-2 ANNULAR 0 ❑ ❑ ❑ 0 <br /> L-8 420 DIESEL ANNULAR 0 ❑ ❑ ❑ 0 <br /> DISP1-2 001 UDC 0 ❑ ❑ ❑ IZI <br /> DISP3-4 001 UDC 0 ❑ ❑ ❑ 0 <br /> DISP5-6 001 UDC 0 ❑ ❑ ❑ 0 <br /> DISP7-8 001 UDC 0 ❑ ❑ ❑ 0 <br /> DISP9-10 001 UDC ❑✓ ❑ ❑ ❑ ❑ <br /> DISP11-12 001 UDC 0 ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> Describe all answers marked "No"or "Fail"and the proposed remedy in Section 8. <br /> List all equipment either replaced or repaired (including cleaning or adjustment) in Section 8. <br /> Page 3 of 6 <br />