Laserfiche WebLink
Underground Storage Tank <br /> Release Detection Equipment Testing Report Form <br /> 9. MONITORING SITE PLAN <br /> Attach a copy of the facility's UST Monitoring Site Plan that shows the general layout of tanks and <br /> dispensers, locations of the monitoring panel and all other release detection equipment, VPH monitoring <br /> zones (if applicable), and the date the site plan was prepared. Include a legend for all symbols depicted. <br /> Underground Storage Tank <br /> Monitoring System Certification Form <br /> MONITORING SITE PLAN Park Street Petroleum,642 Hunter Street,Stockton,CA 95202 <br /> If a site plan has been prepared that shows all required information,you may include it, rather than this page <br /> with your monitoring system certification form.The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel and all leak detection equipment and monitoring locations. Include <br /> a le end for all s mbols depicted. <br /> PARK ST. <br /> ,L <br /> u u <br /> DSL cc <br /> 91 <br /> s a O O O <br /> LJ U Z <br /> Q <br /> O <br /> Z <br /> Q <br /> U I/I LI , Z <br /> <E> STORE <br /> LEGEND <br /> LINE LEAK <br /> • MONITORING PANEL VEEDER ROOT L DETECTOR PLLD <br /> TLS-350 <br /> A ANNULAR SENSOR VEEDER ROOT <br /> 794380-420 — <br /> PRODUCT PIPING — <br /> F FILL AND VAPOR DIRECT BURY 0x <br /> SPILL BUCKETS <br /> VENT RISER 000 <br /> T TURBINE SUMP VEEDER ROOT <br /> LIQUID SENSOR 794380-208 <br /> VAPOR RECOVERY —� <br /> U UDC'S LIQUID VEEDER ROOT PIPING <br /> SENSOR 001 <br /> cc CARBON CANISTER ✓� <br /> 20 10 0 20 40 60 <br /> sCAIEE 1"=20' Page 6 of 6 <br /> Describe all answers marked "No"or "Fail"and the proposed remedy in Section 8. <br /> List all equipment either replaced or repaired (including cleaning or adjustment) in Section 8. <br /> Page 6 of 6 <br />