My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
642
>
2300 - Underground Storage Tank Program
>
PR0231148
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2026 3:36:55 PM
Creation date
7/1/2026 1:38:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0231148
PE
2361 - UST FACILITY
FACILITY_ID
FA0000799
FACILITY_NAME
PARK ST PETROLEUM INC
STREET_NUMBER
642
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13906035
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\bmascaro
Supplemental fields
Site Address
642 N HUNTER ST STOCKTON 95202
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Release Detection Equipment Testing Report Form <br /> 9. MONITORING SITE PLAN <br /> Attach a copy of the facility's UST Monitoring Site Plan that shows the general layout of tanks and <br /> dispensers, locations of the monitoring panel and all other release detection equipment, VPH monitoring <br /> zones (if applicable), and the date the site plan was prepared. Include a legend for all symbols depicted. <br /> Underground Storage Tank <br /> Monitoring System Certification Form <br /> MONITORING SITE PLAN Park Street Petroleum,642 Hunter Street,Stockton,CA 95202 <br /> If a site plan has been prepared that shows all required information,you may include it, rather than this page <br /> with your monitoring system certification form.The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel and all leak detection equipment and monitoring locations. Include <br /> a le end for all s mbols depicted. <br /> PARK ST. <br /> ,L <br /> u u <br /> DSL cc <br /> 91 <br /> s a O O O <br /> LJ U Z <br /> Q <br /> O <br /> Z <br /> Q <br /> U I/I LI , Z <br /> <E> STORE <br /> LEGEND <br /> LINE LEAK <br /> • MONITORING PANEL VEEDER ROOT L DETECTOR PLLD <br /> TLS-350 <br /> A ANNULAR SENSOR VEEDER ROOT <br /> 794380-420 — <br /> PRODUCT PIPING — <br /> F FILL AND VAPOR DIRECT BURY 0x <br /> SPILL BUCKETS <br /> VENT RISER 000 <br /> T TURBINE SUMP VEEDER ROOT <br /> LIQUID SENSOR 794380-208 <br /> VAPOR RECOVERY —� <br /> U UDC'S LIQUID VEEDER ROOT PIPING <br /> SENSOR 001 <br /> cc CARBON CANISTER ✓� <br /> 20 10 0 20 40 60 <br /> sCAIEE 1"=20' Page 6 of 6 <br /> Describe all answers marked "No"or "Fail"and the proposed remedy in Section 8. <br /> List all equipment either replaced or repaired (including cleaning or adjustment) in Section 8. <br /> Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.