Laserfiche WebLink
Geosyntec "' 1111 Broadway, Floor <br /> Oakland,Californias 94607 <br /> PH 510.285.2700 <br /> consultants www.geosyntec.com <br /> July 10, 2026 <br /> Mr. Brendan P. Kenny, RG <br /> Central Valley Regional Water Quality Control Board <br /> 11020 Sun Center Drive <br /> Rancho Cordova, CA 95670 <br /> Subject: Corrective Action Program Update- Second Quarter 2026 <br /> Forward Landfill <br /> Manteca, California, 95336 <br /> Dear Mr. Kenny: <br /> On behalf of Republic Services and Forward Landfill Inc. (Forward), Geosyntec Consultants Inc. <br /> (Geosyntec), is pleased to present the Corrective Action Program Update - Second Quarter 2026 <br /> for the landfill gas collection and control system (GCCS) at Forward Landfill (Landfill) in <br /> Manteca, California. <br /> The Landfill is a municipal solid waste (MSW) landfill that is regulated under Cleanup and <br /> Abatement Order (CAO) R5-2017-0703 and Waste Discharge Requirements (WDR) Order R5- <br /> 2024-0002. This report is being submitted to the Central Valley Regional Water Quality Control <br /> Board(CVRWQCB) in accordance with the CAO R5-2017-0703. The sections that follow outline <br /> the compliance and operational details at the Landfill. <br /> QUARTERLY MONITORING REPORT: SECOND QUARTER(Q1) 2026 <br /> Following CAO R5-2017-0703 and WDR Order R5-2024-0002, Forward is required to submit <br /> quarterly corrective action program updates. These updates include quarterly monitoring results of <br /> the probes subject to CAO and operational status of the gas collection and control system(GCCS). <br /> The sections below summarize the results obtained from sampling and monitoring activities <br /> performed by SCS Engineers (SCS) at the Landfill in the second quarter of 2026 and GCCS <br /> operation. <br /> MONITORING PROBES <br /> The CAO point of compliance monitoring probes includes GP-lA through GP-6A and GP-10 <br /> through GP-15 quarterly. Furthermore, WDR Order R5-2024-0002, requires monitoring GP-07R <br /> through GP-12R and GP-17 through GP-28R quarterly.Under the CAO, each probe interval needs <br /> to be sampled annually in accordance with TO-15 if either methane concentrations exceed I <br /> percent by volume and/or total organic vapors exceed 10 parts per billion by volume (ppbv). <br /> Q2 Corrective Action Program Update-2026 <br /> engineers I scientists I innovators <br />