My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2026 5:03:48 PM
Creation date
7/9/2026 2:22:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0440005
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
201060013, 5
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
Site Address
9999 AUSTIN RD MANTECA 95336
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2867
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GeosyntecO <br /> consultants <br /> becomes available. For sites that do not require the three controlled work zones, the <br /> �rea(s)where work is to be performed shall be called the Work Zone. <br /> isitors to the site may need to be continually escorted for safety purposes.Visitors under <br /> eosY ntec's direction need to check in with the SHSO upon visiting the site. <br /> l or the tasks identified above, the boundaries of the Exclusion Zone, CRZ, and Support <br /> Pone, or the Work Zone, shall be marked using appropriate methods, including but not <br /> invited to warning tape, signs,traffic cones, fencing, or other appropriate means. <br /> 10.5 Site Access <br /> Certain sites require controlled access to the work area. Examples of access controls <br /> include sign in/sign out logs, checking in with guards, and donning identification badges. <br /> Geosyntec personnel will adhere to the site-specific access requirements and monitor that <br /> Subcontractors and other Geosyntec visitors abide by site-specific access control <br /> requirements. <br /> 10.6 Inspections <br /> ❑ APPLICABLE ®NOT APPLICABLE <br /> Based on the hazards identified for the project,periodic health and safety inspections may <br /> be performed. The HSE Inspection Checklist records should be kept on file at the project <br /> site. The frequency for periodic inspections is: <br /> D Weekly <br /> ❑ Monthly <br /> ❑ Other: <br /> Ill. TAILGATE MEETINGS <br /> Tailgate meetings must be held daily prior to starting work to discuss important health <br /> and safety issues concerning tasks to be performed during that shift.Non-Geosyntec site <br /> iworkers should also communicate health and safety concerns associated with the tasks <br /> they will be performing. Topics discussed in the tailgate meetings must be documented. <br /> SAC373 HASP 20 04/2/2026 <br />
The URL can be used to link to this page
Your browser does not support the video tag.