Laserfiche WebLink
Geosyntec'-' <br /> consultants <br /> The levels of PPE required for each task are presented in Appendix E. Required <br /> �quipment and types of protective clothing materials,as well as an indication of the initial <br /> evel of protection to be utilized, are listed. The level of protection may be upgraded or <br /> downgraded by the SHSO according to controls requirements in Appendix E or according <br /> o action levels provided in Appendix D. <br /> f respirators are worn, workers must abide by the company's Respiratory Protection <br /> rogram in accordance with company's Respiratory Protection Program (HS 112). <br /> 5. DECONTAMINATION <br /> he SHSO and Project Manager will determine the type and level of decontamination <br /> procedures for both personnel and equipment based on evaluation of specific work <br /> activities in the controlled work zones. Medical treatment will take precedence over <br /> decontamination in the event of a life threatening and/or serious injury/illness.Personnel <br /> ill perform decontamination in designated and identified areas upon leaving"hot zones" <br /> here the potential exists for exposure to hazardous chemical, biological, or <br /> nvironmental conditions. <br /> Decontamination of personnel in Level D (modified) will consist of proper <br /> Containerization and disposal of coveralls, disposable boots, and gloves (if applicable). <br /> (Decontamination of personnel in Level C, if applicable,will consist, at a minimum, of- <br /> * Removal and cleaning/disposal of boot covers, coveralls, and outer gloves; <br /> • Removal, cleaning, and storage of respiratory protection; <br /> • Washing of non-disposable PPE suspected of being contaminated using a soap <br /> solution followed by a water rinse; and <br /> • Removal and disposal of inner gloves. <br /> and tools and sampling equipment shall be decontaminated as needed by washing in <br /> decontamination basins with appropriate solutions, or, if possible, by dry <br /> (decontamination. Wash solutions and PPE may require disposal at a licensed waste <br /> facility. <br /> 16. SPILL CONTAINMENT <br /> SAC373 HASP 22 04/2/2026 <br />