My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2026 5:03:48 PM
Creation date
7/9/2026 2:22:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0440005
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
201060013, 5
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
Site Address
9999 AUSTIN RD MANTECA 95336
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2867
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1 <br /> Corrective Action Cost Estimate for Financial Assurance <br /> Forward Landfill <br /> 9999 South Austin Road, Manteca, California <br /> t011U „,-..r;:.> <br /> Current Groundwater Corrective Actions <br /> LFG Treatment System O&M/Reporting 30 years $38,000/year $1,140 000 <br /> Additional LFG Collection Well 10 wells $15,000/well $150,000 <br /> Additional LFG Conveyance Piping 1,000 feet $60/foot $60,000 <br /> POC GW Treatment System Design, Permitting and Construction 1 $400,000 <br /> POC GW Treatment System O&M/Reporting 30 years $450,000/year $13,500,000 <br /> Additional GW Extraction Well and Pump 2 wells $100,000/well $200,000 <br /> Additional GW Conveyance Piping 1,000 feet $60/foot $60,000 <br /> Contingencies - 10% $1,551,000 <br /> Subtotal $17,061,000 <br /> Anticipated Groundwater Corrective Actions <br /> Offsite Interim RA: Design, Permitting and Construction 1 - $3,000,000 <br /> Offsite Interim RA: O&M/Reporting 30 years $200,000/year $6,000,000 <br /> Offsite RA: Design, Permitting and Construction 1 $6,500,000 <br /> Offsite RA: O&M/Reporting 30 years $200,000/year $6,000,000 <br /> Contingencies 10% $2,150,000 <br /> Subtotal $23,660,000 <br /> Total - $40,711,000 <br /> Acronyms & Abbreviations <br /> GW = groundwater <br /> LFG = landfill gas <br /> O&M = operations and maintenance <br /> POC = Point of Compliance <br /> RA = Remedial Action <br /> Notes: <br /> Estimated costs represent the anticipated lifecycle (or 30 years, whichever is less). <br /> 1/1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.