My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR2400516
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FYFFE
>
0
>
2900 - Site Mitigation Program
>
SR2400516
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2026 9:21:46 AM
Creation date
7/17/2026 9:13:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR2400516
PE
2900 - Site Mitigation Program
STREET_NUMBER
0
Direction
W
STREET_NAME
FYFFE
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
16203007
CURRENT_STATUS
Active
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
W Fyffe ST STOCKTON 95203
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LIST OF FIGURES <br /> Figure 1: Rough and Ready Island Location Map <br /> Figure 2: Remediation Program Sites <br /> Figure 3: Site 47 Overview and Layout <br /> Figure 4: Project Sierra and Site 47 Overview <br /> Figure 5: Summary of Previous Investigations at Site 47 <br /> Figure 6a: Arsenic Concentrations in Soil <br /> Figure 6b: Arsenic Concentrations in Soil (Northwestern Extent) <br /> Figure 7: Lead Concentrations in Soil <br /> Figure 8a: Benzo(a)anthracene Concentrations in Soil <br /> Figure 8b: Benzo(a)pyrene Concentrations in Soil <br /> Figure 8c: Benzo(b)fluoranthene Concentrations in Soil <br /> Figure 8d: Dibenzo(a,h)anthracene Concentrations in Soil <br /> Figure 8e: Indeno(1,2,3-cd)pyrene Concentrations in Soil <br /> Figure 9: Sediment Sample Locations <br /> Figure 10a: Conceptual Site Model—Human Health Risk Assessment <br /> Figure 10b: Conceptual Site Model—Ecological Risk Assessment <br /> Figure 11: Remedial Boundary and Areas Requiring Institutional Controls <br /> Figure 12: Alternative 2: Existing Durable Cover, Fence, and ICs <br /> Figure 13: Alternative 3: Excavation and On-Site Consolidation, Existing and New Durable <br /> Cover, and ICs <br /> Figure 14: Alternative 4: Excavation with Off-Site Disposal, Existing Durable Cover, and <br /> ICs <br /> Figure 15: Alternative 5: Expanded Excavation with On-Site Consolidation, Existing <br /> Durable Cover, Expanded New Durable Cover, and ICs <br /> Figure l 6: Proposed Modifications of Drainage Channels for Alternative 5 <br /> Figure 17: Preliminary Implementation Schedule for Site 47 Remediation <br /> Site 47 RAP for Soil iv October 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.