Laserfiche WebLink
:ilti. , <br /> Department of Toxic Substances Control <br /> L <br /> Meredith Williams, Ph.D. <br /> Yana Garcia Director Gavin Newsom <br /> Secretary for 8800 Cal Center Drive Governor <br /> Environmental Protection Sacramento, California 95826-3200 <br /> Historical Files from Rough and Ready Island Sites(RRI) <br /> Port of Stockton,Stockton,CA <br /> 06/13/2023 Update <br /> No. DATE SITE TITLE AUTHOR RECIPIENT <br /> Site 7,8, 16, 30, RI SAP for sites <br /> 440 April 1, 1999 33,43,47,48, 7,8,16,30,33,43,47,48,49,50 Field Tetra Tech DON <br /> 49,50 Sampling Plan <br /> 681 April 1, 2007 Site 47 Site 47 Investigation Work Plan ERS POS <br /> Concurrence with August 10,Technical <br /> Memorandum (Tech Memo) Regarding POS, cc: ERS, <br /> 686 August 10, 2007 Site 47 Disturbance to Site 47 Soils from Road DTSC RWQCB <br /> Construction,Stockton RRI <br /> 687 August 10, 2007 Site 47 Technical Memorandum: Site 47 ERS DTSC <br /> 734 March 1, 2009 Site 47 Site 47 Remedial Investigation ERS POS <br /> Action Memorandum For Time Critical <br /> Site 3, 38,47, Removal Actions,Site 3,Site 38 Hot <br /> 742 May 1, 2009 and Landfill Cells ERS POS <br /> Spot,Site 47,and Landfill Cells G, M, <br /> G, M, N and <br /> Site 3, Site 38 ACTION MEMORANDUM FOR TIME <br /> Hot Spot, Site 47, CRITICAL REMOVAL ACTIONS; SITE 3, <br /> 754 May 1, 2010 ERS POS <br /> and Landfill Cells SITE 38 HOT SPOT,SITE 47, and <br /> G, M, and N LANDFILL CELLS G, M, and N <br /> 768 June 1, 2011 Site 47 Draft RI, FS, and RAP for 3 Soil Sites ERS POS <br /> 772 July 29, 2011 Site 47 Draft Remedial Investigation Report ERS POS <br /> DRAFT Site 47 Remedial Investigation POS, cc: DTSC, <br /> 773 July 29, 2011 Site 47 Report-RRI Port West Complex, RWQCB SJCEHD, ERS <br /> Stockton,SJC <br /> DRAFT Final Feasibility Study/Remedial <br /> 774 September 21, Site 47, Building Action Plan -Site 47 and Bldg 917 RWQCB POS, cc: DTSC, <br /> 2011 917 Stockpiles,West Complex, RRI, POS, SJCEHD, ERS <br /> sic <br /> 818 December 1,2014 Site 47 DRAFT Site 47 Soil Sampling Work Plan ERS POS <br /> 825 February 24, 2015 Site 47 DRAFT FINAL Site 47 Soil Sampling ERS DTSC, RWQCB, POS <br /> Work Plan <br /> Comments on DRAFT FINAL Soil <br /> 830 March 17, 2015 CWR Car Storage Sampling Work Plan, CWR Car Storage DTSC ERS, POS, cc: <br /> Yard/Site 47 Yard,Site 47 RWQCB, <br /> Page 1 of 6 <br />