|
:ilti. ,
<br /> Department of Toxic Substances Control
<br /> L
<br /> Meredith Williams, Ph.D.
<br /> Yana Garcia Director Gavin Newsom
<br /> Secretary for 8800 Cal Center Drive Governor
<br /> Environmental Protection Sacramento, California 95826-3200
<br /> Historical Files from Rough and Ready Island Sites(RRI)
<br /> Port of Stockton,Stockton,CA
<br /> 06/13/2023 Update
<br /> No. DATE SITE TITLE AUTHOR RECIPIENT
<br /> Site 7,8, 16, 30, RI SAP for sites
<br /> 440 April 1, 1999 33,43,47,48, 7,8,16,30,33,43,47,48,49,50 Field Tetra Tech DON
<br /> 49,50 Sampling Plan
<br /> 681 April 1, 2007 Site 47 Site 47 Investigation Work Plan ERS POS
<br /> Concurrence with August 10,Technical
<br /> Memorandum (Tech Memo) Regarding POS, cc: ERS,
<br /> 686 August 10, 2007 Site 47 Disturbance to Site 47 Soils from Road DTSC RWQCB
<br /> Construction,Stockton RRI
<br /> 687 August 10, 2007 Site 47 Technical Memorandum: Site 47 ERS DTSC
<br /> 734 March 1, 2009 Site 47 Site 47 Remedial Investigation ERS POS
<br /> Action Memorandum For Time Critical
<br /> Site 3, 38,47, Removal Actions,Site 3,Site 38 Hot
<br /> 742 May 1, 2009 and Landfill Cells ERS POS
<br /> Spot,Site 47,and Landfill Cells G, M,
<br /> G, M, N and
<br /> Site 3, Site 38 ACTION MEMORANDUM FOR TIME
<br /> Hot Spot, Site 47, CRITICAL REMOVAL ACTIONS; SITE 3,
<br /> 754 May 1, 2010 ERS POS
<br /> and Landfill Cells SITE 38 HOT SPOT,SITE 47, and
<br /> G, M, and N LANDFILL CELLS G, M, and N
<br /> 768 June 1, 2011 Site 47 Draft RI, FS, and RAP for 3 Soil Sites ERS POS
<br /> 772 July 29, 2011 Site 47 Draft Remedial Investigation Report ERS POS
<br /> DRAFT Site 47 Remedial Investigation POS, cc: DTSC,
<br /> 773 July 29, 2011 Site 47 Report-RRI Port West Complex, RWQCB SJCEHD, ERS
<br /> Stockton,SJC
<br /> DRAFT Final Feasibility Study/Remedial
<br /> 774 September 21, Site 47, Building Action Plan -Site 47 and Bldg 917 RWQCB POS, cc: DTSC,
<br /> 2011 917 Stockpiles,West Complex, RRI, POS, SJCEHD, ERS
<br /> sic
<br /> 818 December 1,2014 Site 47 DRAFT Site 47 Soil Sampling Work Plan ERS POS
<br /> 825 February 24, 2015 Site 47 DRAFT FINAL Site 47 Soil Sampling ERS DTSC, RWQCB, POS
<br /> Work Plan
<br /> Comments on DRAFT FINAL Soil
<br /> 830 March 17, 2015 CWR Car Storage Sampling Work Plan, CWR Car Storage DTSC ERS, POS, cc:
<br /> Yard/Site 47 Yard,Site 47 RWQCB,
<br /> Page 1 of 6
<br />
|