My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR2400516
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FYFFE
>
0
>
2900 - Site Mitigation Program
>
SR2400516
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2026 9:21:46 AM
Creation date
7/17/2026 9:13:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR2400516
PE
2900 - Site Mitigation Program
STREET_NUMBER
0
Direction
W
STREET_NAME
FYFFE
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
16203007
CURRENT_STATUS
Active
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
W Fyffe ST STOCKTON 95203
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosyntecl�' <br /> consultants <br /> Table F1 <br /> EIR Mitigation Measures for Remediation Activities <br /> Resource Measure <br /> Topic Summary Mitigation Measure <br /> Biological MM-BIO-1: Obtain For western pond turtle,alternatives to SJMSCP coverage will include establishing a buffer area of 300 feet between any <br /> Resources Coverage under the nesting turtle sites and the waters located near the nesting site.These buffers shall be indicated by temporary fencing if <br /> SJMSCP or construction has or will begin before nesting periods are ended(the period from egg laying to emergence of hatchlings is <br /> Implement normally April to November). <br /> Protective Measures For giant garter snake,alternatives to SJMSCP coverage will include limiting construction activities that may disturb <br /> for Nesting Birds, potential giant garter snake habitat to between May 1 and September 30 to the extent practicable.If construction activities <br /> Western Pond are necessary in giant garter snake habitat between October 1 and April 30,a qualified biologist would conduct a survey <br /> Turtle,Giant Garter within 24 hours prior to construction and monitor construction activities to ensure that individuals of giant garter snake <br /> Snake,and Valley encountered during construction are avoided.If a giant garter snake is encountered during construction activities,the <br /> Elderberry biologist will have the authority to stop construction activities until appropriate corrective measures are completed or it is <br /> Longhorn Beetle. determined that the snake will not be harmed. Giant garter snakes encountered during construction activities will be <br /> allowed to move away from the construction area on their own.If giant garter snakes are observed in burrows or other <br /> wintering habitat,burrows will be flagged,and a 200-foot buffer will be established and maintained until the biologist <br /> confirms that snakes are no longer present. The project area will be reinspected by the biologist whenever a lapse in <br /> construction activity of 2 weeks or more has occurred. <br /> For valley elderberry longhorn beetle,alternatives to SJMSCP coverage will include conducting a survey of the project <br /> site to confirm the presence of any elderberry shrubs.If elderberry shrubs are identified on the project site and cannot be <br /> avoided,TC NO. CAL.Development will coordinate a removal and replanting effort with CDFW. <br /> Biological MM-BIO-2: Obtain A NPDES Construction Stormwater General Permit will be obtained for the proposed project,which will require the <br /> Resources and Implement development of a construction Stormwater Pollution Prevention Plan(SWPPP). The construction SWPPP would include <br /> NPDES BMPs including or similar to use of barriers(e.g.,netting or sandbags)to prevent pollutants from entering drainage <br /> Construction channels,equipment inspection for spills,and maintenance and implementation of material spill prevention and cleanup <br /> Stormwater General plans.The construction SWPPP would ensure that contaminants are not accidentally introduced into the drainage <br /> Permit. channels. <br /> Biological MM-BIO-3:Tree TC NO. CAL.Development will plant a minimum of 30 trees,including Patmore ash(Fraxinus p. 'Patmore),Chinese <br /> Resources Replanting. pistache(Pistachia chinensis),coast redwood(Sequoia sempervirens),and multi-trunk chaste tree(Vitex agnus-castus), <br /> on the project Warehouse Development Area in locations where future removal is not likely to be required. <br /> Appendix F:Summary of Environmental Management Measures F-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.