Laserfiche WebLink
Geosyntecl�' <br /> consultants <br /> Table F1 <br /> EIR Mitigation Measures for Remediation Activities <br /> Resource Measure <br /> Topic Summary Mitigation Measure <br /> Geology MM-GEO-3: Standard construction BMPs—including but not limited to use of storm drain inlet filters,erosion control(e.g.,straw <br /> and Soils Implement wattles),and maintenance of spill control kits—will be implemented during construction to control or respond to spills or <br /> Construction Best other potential sources of construction-related pollution. <br /> Management <br /> Practices. <br /> Hazards MM-HAZ-1: Prior to remedial activities,the Port and TC NO. CAL.Development will develop a plan that ensures worker training and <br /> and Minimize Human developing contingencies for responding to hazardous material conditions that may be encountered on site consistent with <br /> Hazardous and Environmental the DTSC approved RAP. <br /> Materials Exposure to <br /> Potentially <br /> Hazardous <br /> Materials During <br /> Construction <br /> Hazards MM-HAZ-2: To address potential impacts to persons and the environment from management of common industrial materials,TC NO. <br /> and Maintain and CAL.Development will develop,implement,and update as needed a Facility-wide Site Management Program. <br /> Hazardous Implement Facility- <br /> Materials wide Site <br /> Management <br /> Program <br /> Note: <br /> All above-listed mitigation measures are from the Draft EIR,dated January 11,2022,and relate to planned remediation activities. <br /> Appendix F:Summary of Environmental Management Measures F-6 <br />