My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR2400516
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FYFFE
>
0
>
2900 - Site Mitigation Program
>
SR2400516
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2026 9:21:46 AM
Creation date
7/17/2026 9:13:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR2400516
PE
2900 - Site Mitigation Program
STREET_NUMBER
0
Direction
W
STREET_NAME
FYFFE
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
16203007
CURRENT_STATUS
Active
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
W Fyffe ST STOCKTON 95203
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosyntecl�' <br /> consultants <br /> Table F1 <br /> EIR Mitigation Measures for Remediation Activities <br /> Resource Measure <br /> Topic Summary Mitigation Measure <br /> Geology MM-GEO-3: Standard construction BMPs—including but not limited to use of storm drain inlet filters,erosion control(e.g.,straw <br /> and Soils Implement wattles),and maintenance of spill control kits—will be implemented during construction to control or respond to spills or <br /> Construction Best other potential sources of construction-related pollution. <br /> Management <br /> Practices. <br /> Hazards MM-HAZ-1: Prior to remedial activities,the Port and TC NO. CAL.Development will develop a plan that ensures worker training and <br /> and Minimize Human developing contingencies for responding to hazardous material conditions that may be encountered on site consistent with <br /> Hazardous and Environmental the DTSC approved RAP. <br /> Materials Exposure to <br /> Potentially <br /> Hazardous <br /> Materials During <br /> Construction <br /> Hazards MM-HAZ-2: To address potential impacts to persons and the environment from management of common industrial materials,TC NO. <br /> and Maintain and CAL.Development will develop,implement,and update as needed a Facility-wide Site Management Program. <br /> Hazardous Implement Facility- <br /> Materials wide Site <br /> Management <br /> Program <br /> Note: <br /> All above-listed mitigation measures are from the Draft EIR,dated January 11,2022,and relate to planned remediation activities. <br /> Appendix F:Summary of Environmental Management Measures F-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.