My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR2400516
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FYFFE
>
0
>
2900 - Site Mitigation Program
>
SR2400516
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2026 9:21:46 AM
Creation date
7/17/2026 9:13:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR2400516
PE
2900 - Site Mitigation Program
STREET_NUMBER
0
Direction
W
STREET_NAME
FYFFE
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
16203007
CURRENT_STATUS
Active
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
W Fyffe ST STOCKTON 95203
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 7: Alternatives Analysis Geosyntec Consultants <br /> Rough and Ready Island, Site 47 <br /> Port of Stockton <br /> EVALUATION Overall Protection of Human Health Compliance with Long-Term Effectiveness and Short-Term Effectiveness Reduction of Toxicity, Implementability Cost' <br /> CRITERIA and the Environment ARARs Permanence Mobility,and Volume <br /> Through Treatment <br /> ALTERNATIVE 5 Yes Yes High High Low Medium Medium <br /> Expanded Alternative 5 would isolate COC/COEC- Alternative 5 is Alternative 5 achieves the RAOs by Alternative 5 presents H&S hazards during Provides no treatment to Alternative 5 uses standard construction equipment,labor, <br /> Excavation with On- impacted soils and would reduce expected to comply isolating COC/COEC-impacted soils construction(i.e.,grading and cover reduce toxicity,mobility,or and materials,which are readily available.Engineering <br /> Site Consolidation, exposure to humans and ecological with all identified from human and ecological receptors. installation).However,worker and volume of contaminants. controls are required to manage erosion,stormwater runoff, <br /> Existing Durable receptors.Land use and activities would chemical-, Regular inspection and maintenance are community protection will be implemented dust,and worker exposure to COCs/COECs.Access around <br /> Cover,Expanded be restricted to minimize exposure to location-,and action- required to remain effective. ICs would via H&S(e.g.,appropriate PPE)and the railroad running through the northwest corner of Site 47 <br /> New Durable Cover, remaining COCs/COECs in soil. specific ARARs. minimize long-term exposure to engineering controls(e.g.,dust suppression would need to be coordinated with the operator,Central <br /> and Institutional remaining COCs/COECs in soil. measures).RAOs would be achieved California Traction Company.Required regulatory <br /> ControlS2 immediately following remedy construction. coordination and plans to implement the remedy should not <br /> cause delays. <br /> Notes <br /> 1.Adjectival cost ratings are based on comparison of estimated net present value cost for each alternative,which are summarized in Table 8. <br /> 2.All alternatives include the implementation of a land-use covenant,similar to the restrictions described in the pre-decisional land-use covenant prepared in accordance with the 2003 Consent Agreement. <br /> Abbreviations <br /> ARARs=Applicable,or Relevant and Appropriate Requirements ICs=institutional controls <br /> COCs=constituents of concern PPE=personal protective equipment <br /> COECs=constituents of ecological concern RAOs=remedial action objectives <br /> H&S=health and safety <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.