Laserfiche WebLink
1+1 <br /> + Group A: Group A sites are considered to have the greatest need for additional investigation and/or <br /> +/ remediation because the extent of contamination is unknown, and under current conditions there is the <br /> x/ \+\+ potential for a completed exposure pathway to a human or ecological receptor. <br /> Group B: Group B sites contain soil and/or groundwater contamination that does not appear to present an <br /> r \ imminent threat to human health and the environment, yet warrants additional investigation, monitoring, and <br /> IIIII F� possibly remediation. <br /> Group C: Group C sites are those which have not been identified as having significant soil or ground water <br /> impacts above background. These sites will be reviewed further to determine whether they require additional <br /> investigation,or may be closed. <br /> Group D: Group D sites have been approved for closure through the PEA process with no further action other <br /> I than the existing land use covenant. Sites in this group have not been explicitly evaluated to determine <br /> SITE 37 `. whether land use controls are required. <br /> Group E: Group E sites have been approved for closure with No Further Action, including no land use <br /> /BIAS-12"'"' IAS,11 <br /> ? ==,i, controls,or for which the necessary restrictions have been explicitly identified in the decision document. <br /> � SITE 38 <br /> X - SITE 33 UST 605 <br /> IAS=09 ; = i - -- o + �� - <br /> k <br /> • SITE 30 - \SIT B E', UST 707 <br /> � <br /> I i + <br /> IAS-02 IAS-14 IAS-4 5 IAS=10 <br /> aQu h � <br /> SITE 9 ° Building 819 Buil <br /> ding `. <br /> SITE•06 410A OWSk 1 <br /> SI6TE <br /> 7-03/b4IAS-16 I <br /> -- - SITE 45 <br /> SITE 51 �C+ SITE 39 r UST 9161 - --- .�! <br /> =, � SITE <br /> 7 SIT ' 5A 1 ❑ '�C cp <br /> Pump House r IAS-07 1 SITE , _ ___ ° s <br /> SITE 43 UST 517 1 <br /> SITE 5G � i SHE-=�= �5B a X'5Do J� SITE 1 �rrl Lv` _ -1 -__ Former it <br /> SITE-50 XX X X— Building- <br /> UST 817B 16 U <br /> I <br /> / k X=X=X X=-X STs <br /> SITE 19 XXX� <br /> IAS __ N <br /> / •��,- ------� I------ ---- - ------- o USTOSite 1201 /+ ON <br /> Former X �y(estimated) k�4 <br /> Pistol r' ".i —�_-_ I /�ti <br /> Range �✓ j� - SITE --=-= 141, <br /> /z <br /> Habitat Area �X � I /+,C, <br /> �X <br /> k <br /> Legend <br /> Remedial Sites-Priority Groups' Jursidictional WetlandsMaters Notes: Remedial Program Sites <br /> Site label color corresponds with priority group symbology. N <br /> 0 Group A X— Fence All locations are approximate. <br /> 'Adapted from 2021 Annual Remediation Program Update,Port of Stockton,2021. Port Of Stockton, Rough&Ready Island <br /> L Group B 0 Buildings 2Adapted from Finding of Suitability for Early Transfer,NAVFAC,2009. Stockton,California <br /> Group C Roads <br /> Group D Parcel Boundaries' Geosyntec® Figure <br /> 0 Group E consultants <br /> ®Navy Retained Conditions INNININININE�,zFeet WR2501B February 2022 2 <br /> \\oakland-01\data\GIS\Port_Of_Stockton\Rough-and-Rea dy-Isla nd-PM\Project\Site 47\2022-02_DraftRAP\Fig02_SiteLayout.mxd 2/7/2022 4:11:01 PM <br />