Laserfiche WebLink
1 <br /> uJ <br /> Q �= DAVIS AV CZ <br /> UJI <br /> - m - <br /> �t 0 <br /> m <br /> ,�40 <br /> FYFFE AV " t + ■ e 1 <br /> v <br /> 41�— <br /> ,. ORT=O EX - -------- ----- --- -- W-284 MCCLrOYAV <br /> W=280 �' J- '.S10C90me wr i a W"28 <br /> 1 i <br /> + Building 219 <br /> ' I i Building 1�28 <br /> Site <br /> PINTER-AV ,'courts <br /> W-282 <br /> Building 129 <br /> i _ u <br /> •-_. _ fir: r. �► —_ � a <br /> GILLISS-AV — <br /> ca r 1 <br /> 1 <br /> W / ? <br /> 0 <br /> to <br /> kLi f <br /> I ► <br /> _. . <br /> ,.: ---------------------------------------- <br /> br *�. <br /> 0" +� ki Fldei�J� Iry ►�. <br /> Legend <br /> Development Features Development Features Cont'd. Site 47 Pre-Decisional LUC Boundary Project Sierra and Site 47 Overview <br /> p p ( ) y � Existing monitoring well for future sampling <br /> 0 Exterior concrete areas and sidewalks Existing Drainage Channel to be modified following 0 Historical and Current Site Features New monitoring well to be installed and sampled after N Site 47 <br /> New railroad spurs development <br /> develo t development Port of Stockton, Rough&Ready Island <br /> - development Existing Drainage Channel Stockton,California <br /> 0 Warehouse and outdoor storage areas Existing Drainage Channel to remain following Roads Existing well to be destroyed prior to development <br /> Parking and driveway areas Geosyntee Figure <br /> Stormwater detention ponds and limited landscape Proposed Drainage Channel <br /> p p Note: consultants <br /> 0 areas Detention Ponds Aerial Imagery Source:Google Earth Pro,August 2018.P 4 <br /> r Project Sierra Development Area 0 260eet WR25016 March 2023 r---1 j p <br /> \\oakland-01\data\GIS\Port_Of_Stockton\Rough-and-Ready-Island-PM\Project\Site 47\2022-02_DraftRAPTig04_ProjectSierraSite470verview_RTmxd 3/8/2023 4:54:43 PM(Author:RThomas) <br />