Laserfiche WebLink
Full Extent Requiring Institutional Controls at Site 47 - <br /> i� Current Figure N ; <br /> -- DAVIS:AV_ <br /> ! / ! 777 <br /> . .� ` W , <br /> —- -- } a s a • a a • r a e ■ • • a + • F_YFF_E AV C�_ �I • .:+J733r :''r . s - <br /> Miles - - — <br /> -- MCCLQY-AV <br /> W-284 W128S <br /> /WEms dw <br /> -280 W 281 /!j JJ� /r .��-~ <br /> r / / <br /> P/NTER-AV— <br /> T <br /> W-282 <br /> ! GIL•L•ISSALi <br /> V �jp <br /> 1 ► ' o <br /> ------------------------- ---------- - r <br /> - - - - <br /> -----------------------------------------I <br /> ite 47 Monitoring Wells �``' <br /> Existing monitoring well for future sampling <br /> -New monitoring well to be installed and sampled after developmen , '� an <br /> - Y r <br /> iA Existing well to be destroyed prior to develo ment Existing Warehouse ° '% <br /> Legend Alternative 5: Expanded Excavation with <br /> Existing Drainage Channel to be modified following development Proiect Sierra Excavation Areas to be Covered with Soil On-Site Consolidation, Existing Durable Cover,Features outside Project Sierra Development Drainage Channel with Contaminated Sediment N Expanded New Durable Cover, and ICs <br /> Existing Drainage Channel to remain following development 0 Stormwater detention ponds and limited landscape areas Existing Covers to be Maintained __� Project Slerra Development Area Site 47 <br /> — Proposed Drainage Channel Detention Ponds Proposed Pavement Remedial Boundary Port of Stockton, Rough&Ready Island <br /> Project Sierra Excavation Areas to be Covered with Hardscape Surface' Proiect Sierra Consolidation Area to be Covered with Concrete' Q Proposed Soil Cover Roads Notes: Stockton California <br /> 0 Exterior concrete areas and sidewalks 0 Warehouse and outdoor storage areas IC=Instutitional Control Geosyntec° Figure <br /> Aerial Imagery Sources:Google Earth Pro,August <br /> _ New railroad spurs 'Section 4.5 describes the site grading,fill import/placement,and durable cover installation activities proposed by the Project Sierra development.These activities meet and 2018(Main Figure)and ESRI Basemap, consultants <br /> exceed the minimum requirements to address the RAOs;lesser amounts of site grading and fill impor/placement,and/or different types of hardscape finish surfaces would also May 2020(Inset) <br /> 0 Parking and driveway areas 0 250 15 <br /> address RAOs.To support a comparison with other remedial alternatives,the cost estimate for Alternative 5 elements within the Project Sierra development focuses on the site Feet W R2501 B March 2023 <br /> grading and fill import/placement required within the remedial boundary,and is not intended to incorporate all site development elements <br /> \\oakland-01\data\GIS\Port_Of_Stockton\Rough-and-Ready-Island-PM\Project\Site 47\2022-02_DraftRAP\Figl5_Alt5_ExpandedExcavation_RT.mxd 3/8/2023 5:01:06 PM(Author:RThomas) <br />