My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR2400641
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
303
>
2900 - Site Mitigation Program
>
SR2400641
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2026 9:39:33 AM
Creation date
7/17/2026 9:35:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR2400641
PE
2900 - Site Mitigation Program
STREET_NUMBER
303
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13908003
CURRENT_STATUS
Closed - Complete
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
303 N EL DORADO ST STOCKTON 95202
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KLE/NFELOER <br /> Bright People.Right Solutions. <br /> Job Loss Analysis <br /> Job Task Air Quality Monitoring and Sampling <br /> Publish Date: October 16, 2007 Origination Date: 10/16/2007 <br /> Group Environmental Category Sampling <br /> Development Team: Ray Fitzpatrick, Mike Latest Review Team: Colleen Kovarik <br /> Me erhoefer, John Martin <br /> Minimum Required Equipment(check all that apply) <br /> X Reflective Vest Goggles Supplied Air Respirator Other: <br /> X Hard Hat Face Shield Air Purifying Respirator Cartridge: <br /> X Steel Toed Boots Life/Harness Protective Clothing Material: <br /> X Safety Glasses Hearing Protection X Gloves Material: Electrical Insulated gloves <br /> Client Specific: <br /> Job Steps Risks/Hazards Quality/Safe Work Practices <br /> Follow procedures established through Client meeting discussions and <br /> formal Property Access Agreement Terms and Conditions; In cases <br /> Unauthorized Access such as Client required Emergency Responses,engage both Client and <br /> Project Team Leadership/Legal Assets to draft generalized Agreements <br /> proactively. <br /> Brief the affected third party to explain the proposed rationale for and <br /> approach to work objectives. Similarly,inform that party when changes in <br /> approach are warranted that may affect either ther schedule or <br /> Technical/Logistical Misinterpretation expectations and when the stated effort and access is completed and <br /> request inspection of premises for verbal confirmation that the work area <br /> has been left in an acceptable manner. Do not provide interpretation of <br /> collected data. <br /> Initial Inspection and Setup During the Maintain buddy system where,at no point,is anyone left in a residential <br /> Monitoring/Sampling Event. Personnal integrity house alone. Inclusion of regulatory representative(s)is preferred <br /> wherever possible. <br /> Trip/fall hazards Assess physical conditions of the proposed work area particularly low- <br /> light conditions and obstructions in walking areas. <br /> Struck Against Assess the work area for low hung objects or joists,ceilings,pipes,etc. <br /> Wear a hard hat when low overhead hazards are present. <br /> Avoid working in wet area; Use ground fault circuit interrupt breakers for <br /> Electrical Hazards protection during use of electrical extension cords; Wear insulated <br /> gloves when handling potentially conductive or energized equipment or <br /> materials. <br /> When in low headroom areas,avoid strains and sprains by maintaining <br /> Strains and Sprains correct posture wherever possible and utilizing mechanical devices for <br /> moving equipment. <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.