Laserfiche WebLink
KL E//VFEL OER <br /> Bright People.Right Solutions. <br /> Job Loss Analysis <br /> Job Task Drilling Oversight <br /> Origination Date: April 3, 1999 Revision#2 Revision Date: February 22,2013 <br /> Development Team: E. Morley John, James Gingery Review Team: Dave Jenkins Group: Environmental/Hollow Stem <br /> IAuger <br /> Required Equipment for task(check specific job steps below for required PPE) <br /> X Reflective Vest Goggles IS.pplied Air Respirator Other: <br /> X Hard Hat Face Shield Air Purifying Respirator I Client Specific: <br /> X Steel Toed Boots Life/Harness Protective Clothing Material: <br /> X Safety Glasses X Hearing Protection Gloves Material: <br /> Job Steps Risks/Hazards Quality/Safe Work Practices <br /> Arrive on site,contact driller, review Delays due to improper planning Have all necessary equipment available <br /> scope of work and safety plan <br /> Overhead-visible inspection,stay minimum of 15 feet away from power lines <br /> depending on voltage <br /> Locate drilling Contact with utilities-above and below Underground-Driller to locate utilities via USA or other means. Geologist to <br /> verify that USA has been notified. <br /> Driller to hand auger first 5 feet <br /> Stay 3 feet from equipment. <br /> Do not take material from moving auger,ask driller to obtain sample. <br /> Contact with moving equipment <br /> Wear proper PPE(hardhat,steel-toed shoes,safety glasses) <br /> Be aware of rig kill switch in case of emergency. <br /> Do not travel below overhead equipment. <br /> Contact with augers moving overhead Maintain awareness(look up) <br /> Conduct drilling Wear proper PPE(hardhat,steel-toed shoes,safety glasses) <br /> Do not work or approach driller/helper from behind. <br /> Page 1 of 2 <br />