My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
602
>
2900 - Site Mitigation Program
>
PR2400196
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2026 10:00:12 AM
Creation date
7/17/2026 9:44:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR2400196
PE
2903 - WORKPLAN/REPORT PLAN CHECK - OTHER AGENCY
FACILITY_NAME
STALLWORTH AUTO SALES
STREET_NUMBER
602
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13916509
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
602 N CALIFORNIA ST STOCKTON 95202
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GROUND ZERO <br /> ANALYSIS, INC. <br /> 1172 Kansas Avenue,Suite A <br /> Modesto,CA 95351 <br /> 209.522.4119-PH <br /> 209.522.4227-FAX <br /> groundzeroana lysis.com <br /> July 23,2024 <br /> Ms. Vera Fischer <br /> California Regional Water Quality Control Board <br /> Central Valley Region <br /> 11020 Sun Center Drive, #200 <br /> Rancho Cordova, CA 95670 <br /> Subject: Shallow Soil and Soil Vapor Assessment <br /> Stallworth Auto Sales, 602 N. California St., Stockton, CA <br /> Geotracker Global ID T0607700523 (Figure 1) <br /> Dear Ms. Fischer: <br /> We have prepared this report on behalf of Stallworth Auto Sales to present the results of our <br /> shallow soil and soil vapor testing. <br /> Ground Zero prepared the Additional Investigation Workplan dated December 27, 2023. <br /> The workplan was approved with conditions by your office in a letter dated February 8, <br /> 2024. As per the letter, two (2) temporary soil vapor monitoring points were installed at <br /> the locations shown on Figures 2 and 3. In addition a third soil boring was also installed to <br /> collect soil samples from the depths of five and ten feet. <br /> The vapor sampling locations were intended to address the potential vapor intrusion risk to <br /> the existing building, in the vicinity of the groundwater contaminant plume core, as per the <br /> criteria in the SWRCB Low Threat Underground Storage Tank Case Closure Policy <br /> (LTCP). <br /> The soil boring was intended to address potential direct contact risk per the LTCP. <br /> Protocols,Pre-field Work and Permitting Activities <br /> Fieldwork was conducted in accordance with Ground Zero's Quality Assurance/Quality <br /> Control Plan and Health & Safety Plan. Underground utilities were checked by clearly <br /> marking the proposed boring locations in white paint and calling in the location for a <br /> clearance ticket by Underground Services Alert(USA). <br /> A drilling permit was issued by the San Joaquin County Environmental Health Department <br /> (SJEHD). A copy of the permit is included as Attachment A. <br /> Soil Vapor Assessment Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.