Laserfiche WebLink
GROUND ZERO ANALYSIS,INC. Quality Control/Quality Assurance Plan <br /> Groundwater samples will be collected with a Teflon bailer with bottom emptying device. Duplicate <br /> samples will be transferred to vials or containers that meet Regulatory Agency specifications (Table <br /> 1). Groundwater from the bailer will be transferred to the sample container by allowing the fluid to <br /> flow slowly along the sides of the vessel. All containers will be filled above the top of the opening to <br /> form a positive meniscus. No head space should be present in the sample container once it is sealed. <br /> After the vial is capped it will be inverted to check for air bubbles. If bubbles are present the sample <br /> will be discarded and replaced. If it is not possible to collect a sample without head space,the problem <br /> will be noted on the field technician's sampling log. <br /> Immediately following sample collection, samples will be labeled and stored in an ice chest <br /> containing frozen chemical ice sealed in plastic bags. Sample labels will contain the following <br /> information:date,time,project ID,sample ID,and name of sampler and type of analysis. All samples <br /> will be transported under chain of custody protocol to a state certified laboratory within 24 hours. A <br /> sample container filled in the laboratory with organic free water and carried unopened during the <br /> sampling trip will also be provided(Trip Blank). A "high-low" temperature recording thermometer <br /> will accompany sample shipments to ensure proper sample temperature maintenance. <br /> Samples will be transported either by Ground Zero Analysis (GZA)personnel or by private courier. <br /> Analytical holding times will be considered in determining sampling and shipping schedules. Friday <br /> shipment/Saturday laboratory receipt of samples will be coordinated in advance with the laboratory. <br /> 10.2 Direct Push Borings <br /> Groundwater samples obtained using a direct push method,sampling will be conducted in accordance <br /> with ASTM Standard Guide for Direct Push Groundwater Sampling for Environmental Site <br /> Characterization(ASTM D6001 —05). <br /> Groundwater samples may be obtained using a CPT rig. In this case when the pore pressure <br /> dissipation test indicates that groundwater has been reached, the CPT tool will be withdrawn and <br /> a sample collected using a hydropunch in accordance with ASTM D6001. CPT testing will <br /> conducted in accordance with the Standard Practice for Using the Electronic Piezocone <br /> Penetrometer Tests for Environmental Site Characterization(ASTM D6067— 10). <br /> 11.0 INDOOR AIR SAMPLING <br /> Indoor air sampling will be conducted in accordance with the procedures specified in the document <br /> Final, Guidance for the Evaluation and Mitigation of Subsurface Vapor Intrusion to Indoor Air <br /> (DTSC, October 2011). <br /> G:\Data\GROUNDZE\STALLWORTH AUTO SALES(N CA)1380\Workplan\QA.QC Plan.docx <br /> 10 <br />