Laserfiche WebLink
Ground Zero Analysis, Inc. <br /> HEALTH AND SAFETY PLAN <br /> Off-site communications: ❑ Radio X Telephone ❑ Other <br /> The specific signal for an emergency is: Verbally Given <br /> The specific signal for an evacuation is: Verbally Given <br /> Evacuation assembly point is: Location as determined by On Site Safety Officer and marked on site map daily <br /> MARK EVACUATION ROUTE(S) ON SITE MAP O CHECK WHEN DONE <br /> SANITATION AND DECONTAMINATION <br /> Personnel Decontamination Procedure: <br /> All contaminated personal protective equipment(i.e.,gloves,coveralls)will be placed in DOT approved 55-gallon steel <br /> drums. The drums are to be secured daily before personnel leave the site as well as secured and properly labeled upon <br /> the completion of the investigation activities. <br /> Location of Wash Water: At Site <br /> Location of Toilet: At Site <br /> Location of Drinking Water: Brought to Site <br /> Equipment Decontamination Procedure: Equipment will be washed with an Alconox® solution and/or <br /> steam cleaned. <br /> Materials to be disposed of as Hazardous Waste: All soil generated during the scope of work will be stored in a <br /> DOT approved 55-gallon steel drum until a disposal profile is <br /> completed. <br /> PAGE <br />