Laserfiche WebLink
AEI Consultants BORING NUMBER SB-1 <br /> •'�. <br /> • • 2500 Camino Diablo <br /> • • 0` AE1 <br /> PAGE 1 OF 1 <br /> 0* 00 Walnut Creek,CA 94596 <br /> ••'a° Telephone: 925-746-6000 <br /> Fax: 925-746-6099 <br /> CLIENT G&C Autobody PROJECT NAME Limited Phase II Subusurface Investigation <br /> PROJECT NUMBER 501222 PROJECT LOCATION 2461 North Wilson Way,Stockton CA <br /> DATE STARTED 12/9/24 COMPLETED 12/9/24 GROUND ELEVATION HOLE SIZE 2.25 inches <br /> DRILLING CONTRACTOR ECA GROUND WATER LEVELS: <br /> DRILLING METHOD Direct Push AT TIME OF DRILLING --- <br /> LOGGED BY Madison Kennedy CHECKED BY C.Klock AT END OF DRILLING --- <br /> NOTES AFTER DRILLING --- <br /> L <br /> CL <br /> H W H ° U <br /> 2 <br /> � — m z o_00 MATERIAL DESCRIPTION COMPLETION <br /> p aD in 0 �J <br /> az U <br /> 0.0 <br /> � a <br /> ASPHALT+FILL <br /> Wellbox and <br /> 0.5 surface completion <br /> SILTY CLAY(CL),dark grayish brown(10 YR 4/2),very stiff, <br /> SB-1-1' moist,fines,low plasticity,no odor. <br /> 0.0 <br /> At 1.25 ft bgs,trace brick. <br /> At 2 ft bgs, no brick. Neat cement grout <br /> SB-1-2.5' <br /> 2.5 <br /> 0.1 <br /> 1/4"OD teflon <br /> tubing <br /> At 3 ft bgs,trace silt. <br /> o At 4 ft bgs,grades to dark yellowish brown(10 YR 4/4),medium <br /> Dry bentonite <br /> z <br /> stiff. <br /> W- - .. *.j <br /> m SB-1-5' <br /> N 5.0 Filter <br /> N <br /> 0 0.0 <br /> 9 No.3 sand <br /> 0 <br /> 0 <br /> 0 <br /> z <br /> O <br /> LU <br /> 0 <br /> z <br /> w <br /> LU <br /> 7.5 <br /> U <br /> M <br /> O <br /> 7 <br /> N <br /> M <br /> N <br /> H <br /> At 9 ft bgs,with fine sand. <br /> U) <br /> 0 <br /> VSB-1-1011 <br /> z 10.0 10.0 <br /> 0.0 Bottom of borehole at 10.0 feet. <br /> c� <br /> z <br /> 0 <br /> 0 <br /> m <br /> w <br />