Laserfiche WebLink
AEI Consultants BORING NUMBER SB-4 <br /> •'�. <br /> • • 2500 Camino Diablo <br /> • • 0` AE1 <br /> PAGE 1 OF 1 <br /> 0* 00 Walnut Creek,CA 94596 <br /> ••'a° Telephone: 925-746-6000 <br /> Fax: 925-746-6099 <br /> CLIENT G&C Autobody PROJECT NAME Limited Phase II Subusurface Investigation <br /> PROJECT NUMBER 501222 PROJECT LOCATION 2461 North Wilson Way,Stockton CA <br /> DATE STARTED 12/9/24 COMPLETED 12/9/24 GROUND ELEVATION HOLE SIZE 2.25 inches <br /> DRILLING CONTRACTOR ECA GROUND WATER LEVELS: <br /> DRILLING METHOD Direct Push AT TIME OF DRILLING --- <br /> LOGGED BY Madison Kennedy CHECKED BY C.Klock AT END OF DRILLING --- <br /> NOTES AFTER DRILLING --- <br /> L <br /> H Lu H ° U <br /> a _ _j� O MATERIAL DESCRIPTION COMPLETION <br /> p� o-D in 0 �J <br /> a Z U C7 <br /> 0 <br /> � a <br /> SILTY CLAY(CL),dark yellowish brown(10 YR 4/4), medium <br /> stiff, moist,fines,low plasticity,no odor. <br /> Well box and <br /> surface completion <br /> [SB-44 <br /> 1 <br /> 0.1 <br /> 2 Neat cement grout <br /> U) <br /> o SB-4-2.5' At 2 ft bgs,trace silt,grades to black(10YR 2.5/1),very stiff <br /> cD <br /> z <br /> 0 0.0 <br /> m <br /> N <br /> N 1/4"OD teflon <br /> tubing <br /> Q 3 <br /> 0 <br /> z <br /> 0 <br /> 0 <br /> 0 <br /> 0 <br /> w <br /> z <br /> Y <br /> LU <br /> P 4 Dry bentonite <br /> U <br /> M <br /> O <br /> 7 <br /> N <br /> M <br /> N <br /> o SB-4-5' Filter <br /> 0 <br /> a 5 <br /> U) 0.0 <br /> 0 No.3 sand <br /> z <br /> c� <br /> Bottom of borehole at 5.0 feet. <br /> z <br /> 0 <br /> m <br /> w <br />