Laserfiche WebLink
The test wells and piezometers are designed with a minimal seal thickness with well screens <br /> as close as possible to the garage floor slab, so that there is hydraulic communication <br /> between the aggregate base rock immediately below the floor slab and the test wells/ <br /> piezometers. <br /> Malcolm shall provide, install in selected wells, and connect: <br /> • Eight (8) permanent electrical pumps, <br /> • Eight (8) pump controllers with remote interface, and <br /> • Seventeen (17) transducers. <br /> Drilling waste shall be transported from the lower-level parking garage and into street-level <br /> for temporary storage pending off-hauling and disposal. <br /> Malcolm shall provide logistical support to Geo Blue for pumping tests. <br /> 2 <br />