My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0078254 (3)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
601
>
2900 - Site Mitigation Program
>
SR0078254 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2026 2:23:14 PM
Creation date
7/17/2026 2:09:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0078254
PE
2903 - WORKPLAN/REPORT PLAN CHECK - OTHER AGENCY
FACILITY_ID
FA0024288
FACILITY_NAME
MAIN ST INVESTMENTS
STREET_NUMBER
601
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14918006
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
601 E MAIN ST STOCKTON 95205
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Assessment Work Plan <br /> MAIN STREET INVESTORS (CITY OF STOCKTON) <br /> 601 East Main Street, Stockton, California <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 1.0. INTRODUCTION................................................................................................... 1 <br /> 2.0. SCOPE OF WORK................................................................................................ 1 <br /> 2.1. PERMITTING AND PRE-FIELD WORK ACTIVITIES ........................................ 2 <br /> 2.2 MONITORING WELL INSTALLATION...............................................................2 <br /> 2.2.1. Well Development and Survey .................................................................... 2 <br /> 2.2.2. Groundwater Sampling and Analysis...........................................................2 <br /> 2.3. SOIL PROBE BORINGS AND SAMPLING........................................................ 3 <br /> 2.4. REPORT PREPARATION.................................................................................. 3 <br /> 3.0. FIELD PROCEDURES..........................................................................................3 <br /> 3.1. PILOT SOIL BORING ADVANCEMENT AND SOIL SAMPLE COLLECTION ...4 <br /> 3.2. SOIL PROBE BORING ADVANCEMENT AND SAMPLE COLLECTION ..........4 <br /> 3.3. GRAB GROUNDWATER SAMPLE COLLECTION............................................4 <br /> 3.4. MONITORING WELL COMPLETION ................................................................ 5 <br /> 3.5. WELL DEVELOPMENT AND SURVEY............................................................. 5 <br /> 3.6. GROUNDWATER SAMPLING PROCEDURES................................................. 6 <br /> 3.7. BORING ABANDONMENT................................................................................ 6 <br /> 3.8. EQUIPMENT DECONTAMINATIONMASTE MANAGEMENT.......................... 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.