My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0078254 (3)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
601
>
2900 - Site Mitigation Program
>
SR0078254 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2026 2:23:14 PM
Creation date
7/17/2026 2:09:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0078254
PE
2903 - WORKPLAN/REPORT PLAN CHECK - OTHER AGENCY
FACILITY_ID
FA0024288
FACILITY_NAME
MAIN ST INVESTMENTS
STREET_NUMBER
601
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14918006
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
601 E MAIN ST STOCKTON 95205
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
27 February 2019 AdvancedGeo <br /> AGE Project No. 08-1650 Environmental <br /> Page 6 of 6 <br /> 3.6. GROUNDWATER SAMPLING PROCEDURES <br /> Groundwater sample collection will be performed in accordance with AGE's standard <br /> monitoring and sampling procedures, which have been included as Appendix B. <br /> 3.7. BORING ABANDONMENT <br /> All soil borings not completed as groundwater monitoring wells will be permanently sealed <br /> to prevent vertical migration of potential contaminants. Soil borings shall be abandoned <br /> by backfilling with cement grout from the total depth to surface grade. Borings advanced <br /> below the groundwater table will be abandoned with grout utilizing tremie procedures. <br /> The top three to six inches of the boring abandonments will be completed flush to surface <br /> grade with concrete. The SJCEHD will be notified for grout inspection at least 48 hours <br /> prior to conducting grouting procedures <br /> 3.8. EQUIPMENT DECONTAMINATIONIWASTE MANAGEMENT <br /> All sampling tools used for sample collection, except for disposable bailers, will be <br /> thoroughly rinsed with clean water after being washed with a solution of Alconox. All <br /> down-hole drilling equipment will be pressure washed prior to starting each boring. <br /> Cuttings generated during drilling and rinseate generated during drilling and groundwater <br /> sampling activities will be containerized in properly labeled DOT-approved 55-gallon <br /> drums and stored on-site in an area lacking public access. Disposal alternatives will be <br /> evaluated based on results of soil and water analysis <br />
The URL can be used to link to this page
Your browser does not support the video tag.