My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EDISON
>
345
>
2900 - Site Mitigation Program
>
PR0549055
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2026 2:35:56 PM
Creation date
7/17/2026 2:33:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0549055
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0028161
FACILITY_NAME
NORTHERN 2-ACRES COLBERG BOAT WORKS
STREET_NUMBER
345
Direction
N
STREET_NAME
EDISON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13546001
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
345 N EDISON ST STOCKTON 95203
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chris Baldassari <br /> From: Wright, Dean@DTSC <Dean.Wright@dtsc.ca.gov> <br /> Sent: Tuesday,January 30, 2024 11:55 AM <br /> To: Chris Baldassari <br /> Cc: Christianson, Greg <br /> Subject: RE: Northern 2-acres of Colberg - Proposed Additional Soil Sampling <br /> Hi Chris, <br /> Thankyou forthe opportunityto reviewthe additional sampling planned forthe Northern 2-acre Colberg property <br /> in Stockton. Please proceed with the sampling effort at your earliest convenience while incorporating a minimum <br /> 2-week notice to me of the anticipated sampling date. This notice will allow me to alert Ms. Katherine Perez and <br /> ensure the Nototomne Cultural Preservation concerns are addressed prior to the field work. Thanks, <br /> Dean Wright, P.G. <br /> Project Manager <br /> Site Mitigation and Restoration Program/Sacramento <br /> 916-255-3591 <br /> Dean.Wright@dtsc.ca.gov <br /> Department of 1"oxic Substances Control <br /> 8800 Cal Center Drive,Sacramento,California 95826-3200 <br /> California Environmental Protection Agency <br /> DTSC <br /> �¢psrtm nt a Yo¢ic <br /> \I © O <br /> From:Chris Baldassari<Chris.Baldassari @nv5.com> <br /> Sent:Thursday,January 25, 2024 2:21 PM <br /> To: Wright, Dean@DTSC<Dean.Wright@dtsc.ca.gov> <br /> Cc: Christianson, Greg<Greg.Christianson@alston.com> <br /> Subject: Northern 2-acres of Colberg- Proposed Additional Soil Sampling <br /> Good afternoon Dean, <br /> I hope this email finds you well.The following presents a proposed plan for focused additional sampling at the Northern <br /> 2-acre Colberg site in Stockton. <br /> As you may recall, soil sampling was conducted at the adjacent parcel in December 2022. Based on sampling results in <br /> the southeastern portion of the adjacent parcel (see attached figure), this supplemental sampling, consisting of <br /> advancing four vertical borings and collecting multiple depth-discrete soil samples, is proposed herein with the objective <br /> of reducing possible data gaps (e.g., depth and lateral extent)for elevated arsenic concentrations in soil in that area. <br /> Pre-field, drilling, sampling, and analytical activities would be consistent with prior DTSC-approved investigation <br /> methods and procedures (specifically,as presented in the August 26,2021 Supplemental Sampling Findings,Proposed <br /> Excavation and Sampling Plan). Drilling will be conducted by a C-57 licensed driller under an applicable permit issued by <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.