My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR2501672
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
SR2501672
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2026 11:40:33 AM
Creation date
7/17/2026 2:41:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR2501672
PE
2900 - Site Mitigation Program
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513016
CURRENT_STATUS
Closed - Complete
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
12751 N THORNTON RD LODI 95242
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
p. 2 <br /> - Method of determining when development is complete <br /> - Disposal of development water <br /> E. Well Survey (precision of vertical survey data shall be at least 0.01 foot): <br /> - Identify the Licensed Land Surveyor or Civil Engineer that will perform the survey <br /> - Datum for survey measurements <br /> - List well features to be surveyed (i.e. top of casing, horizontal and vertical coordinates, <br /> etc.) <br /> F. Schedule for Completion of Work <br /> G. Appendix: Groundwater Sampling and Analysis Plan (SAP) <br /> The Groundwater SAP shall be included as an appendix to the workplan, and shall be <br /> utilized as a guidance document that is referred to by individuals responsible for <br /> conducting groundwater monitoring and sampling activities. <br /> Provide a detailed written description of standard operating procedures for the <br /> following: <br /> - Equipment to be used during sampling <br /> - Equipment decontamination procedures <br /> - Water level measurement procedures <br /> - Well purging (include a discussion of procedures to follow if three casing volumes <br /> cannot be purged) <br /> - Monitoring and record keeping during water level measurement and well purging <br /> (include copies of record keeping logs to be used) <br /> - Purge water disposal <br /> - Analytical methods and required reporting limits <br /> - Sample containers and preservatives <br /> - Sampling <br /> o General sampling techniques <br /> o Record keeping during sampling (include copies of record keeping logs to be used) <br /> o QA/QC samples <br /> - Chain of Custody <br /> - Sample handling and transport <br /> SECTION 2 - Monitoring Well Installation Report <br /> The monitoring well installation report must provide the information listed below. In addition, <br /> the report must also clearly identify, describe, and justify any deviations from the approved <br /> workplan. <br /> A. General Information: <br /> - Purpose of the well installation project <br /> - Brief description of local geologic and hydrogeologic conditions encountered during <br /> installation of the wells <br /> - Number of monitoring wells installed and copies of County Well Construction Permits <br /> - Topographic map showing facility location, roads, surface water bodies <br />
The URL can be used to link to this page
Your browser does not support the video tag.