My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR2602100
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN CENTER SM
>
374
>
2900 - Site Mitigation Program
>
SR2602100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2026 3:01:52 PM
Creation date
7/17/2026 2:56:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR2602100
PE
2900 - Site Mitigation Program
STREET_NUMBER
374
Direction
W
STREET_NAME
LINCOLN CENTER SM
City
STOCKTON
Zip
95207
APN
09741043
CURRENT_STATUS
In Review
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
374 W LINCOLN CENTER SM STOCKTON 95207
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosyntec° <br /> consultants <br /> INTRODUCTION <br /> This site-specific Health and Safety Plan (HASP) was prepared to address project-specific <br /> hazards known or suspected to be present associated with the existing conditions and work to be <br /> performed at the work site(s). This HASP was prepared to meet the requirements specified in <br /> Occupational Safety and Health (OSHA) Hazardous Waste Operations Emergency and Response <br /> (HAZWOPER)program, Geosyntec's Health and Safety (H&S) Procedure HS 301, and the H&S <br /> requirements of the client. <br /> 1. SIGNATURES <br /> 1.1 Preparers and Reviewers <br /> This HASP must be maintained on site when field work is being performed. The Site Health and <br /> Safety Officer (SHSO) can change or amend this document, in agreement with the Health and <br /> Safety Coordinator (HSC) or Project Manager. Amendments (e.g., changes in personal <br /> protective equipment, addition of tasks, etc.) must be documented in Section 18 and in <br /> Appendix A. This HASP must be reviewed and amended on an annual basis for projects lasting <br /> more than one year. <br /> Prepared by: <br /> SHSO—Katherine Clark <br /> Reviewed by: <br /> HSC—Richard Hodges <br /> Approved by: <br /> Project Manager—Jamie Purcell Date <br /> This HASP has been given to the following H&S approved subcontractor(s). <br /> Subcontractor: Representative: Date: <br /> Subcontractor: Representative: Date: <br /> Subcontractor: Representative: Date: <br /> SAC111 HASP-June 2023 1 6/23/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.