Laserfiche WebLink
Geospte& <br /> consultants <br /> 3. PROPOSED SCOPE OF WORK <br /> This section describes the proposed approach and work elements for well destruction. <br /> 3.1 Pre-Field Activities <br /> Prior to initiating fieldwork at the Site, the following pre-field activities will be completed. <br /> 3.1.1 Health and Safety Planning <br /> Current field conditions will be reviewed by staff before commencing field activities. The <br /> assessment will include the following items: <br /> • Evaluating known existing utilities in relation to the proposed boring locations <br /> • Ensuring safe access and movement within the work area <br /> • Assessing overall health and safety conditions for the planned well destructions <br /> After a review of field conditions has been completed, a Site-specific task hazard analysis (THA) <br /> will be prepared to support safe work practices. The THA will contain procedures for hazard <br /> identification and mitigation, stop work authority, emergency response (including a map of the <br /> nearest hospital and emergency contact information), incident reporting, and use of appropriate <br /> personal protective equipment. Hazards identified and controls developed will be communicated <br /> with all field personnel prior to executing the proposed scope of work. <br /> Prior to the start of field activities each day, a safety tailgate meeting will be conducted between <br /> Geosyntec field staff and subcontractors to discuss the field activities to be performed that day and <br /> the THA elements listed above. <br /> 3.1.2 Notifications,Access, and Permitting <br /> Prior to the start of field work, the following will be performed: <br /> • Coordinate with the property owner of the agricultural parcels for access to MW-9 <br /> through MW-15 <br /> • Coordinate with UPRR,CFNR, and National Railroad Safety Services(the UPRR-and <br /> CFNR-designated railroad flagging service) for access to MW-5 <br /> • Select and retain utility locating and drilling subcontractors <br /> • Create a ticket with Underground Service Alert of Northern California (USA-North) <br /> • Obtain a drilling permit from the San Joaquin County Environmental Health <br /> Department(SJCEHD) <br /> The CVRWQCB will be notified of the planned work schedule a minimum of two weeks prior to <br /> the start of field activities. <br /> Well Destruction Work Plan 4 May 2026 <br />