Laserfiche WebLink
Geospte& <br /> consultants <br /> 5. REFERENCES <br /> Amec Foster Wheeler Environment & Infrastructure, Inc. 2017. 2017 Conceptual Site Model <br /> Report, Olin Chlor Alkali Facility— Tracy, California. August 31. <br /> California Department of Water Resources. 2006. California's Groundwater (Bulletin 118), San <br /> Joaquin River Hydrologic Region, San Joaquin Valley Groundwater Basin, San Joaquin <br /> Valley Groundwater Basin, Tracy Subbasin. Updated January 20. <br /> CVRWQCB. 2022a. Response to Proposed Revisions to Monitoring and Reporting Program R5- <br /> 2012-0813, Olin Chlor Alkali Facility, Tracy, San Joaquin County, California. Central Valley <br /> Regional Water Quality Control Board. June 2. <br /> CVRWQCB. 2022b. Revised Monitoring and Reporting Order No. R5-2012-0813-02, California <br /> Water Code Section 13267 for Olin Chlor Alkali Tracy Facility, San Joaquin County. May <br /> 31. <br /> CVRWQCB. 2026a. Conditional No Further Action Determination, Olin Chlor Alkali Facility, <br /> Tracy, San Joaquin County, California. April 20. <br /> CVRWQCB. 2026b.Rationale for Considering Conditional No Further Action, Olin Chlor Alkali <br /> Facility, 26700 South Banta Road, Tracy, San Joaquin County. March 26. <br /> Geosyntec. 2023. Revised 2023 Biennial Monitoring and Sampling Report, MRP Order No. R5- <br /> 2012-0813-02, Olin Chlor Alkali Facility, Tracy, California. Geosyntec Consultants, Inc. <br /> October 5. <br /> Geosyntec. 2025. Revised Request for No Further Action—Groundwater, Former Olin Chlor <br /> Alkali Facility, 26700 South Banta Road, Tracy, California, September 19. <br /> Geosyntec.2026.Destruction ofMW-6 and Banta Wells,Former Olin Chlor Alkali Facility,26700 <br /> South Banta Road, Tracy, California. March 2. <br /> SECOR International Inc. 2001. Feasibility Study/Remedial Options Evaluation Report. Prepared <br /> for Pioneer Americas, Inc. SECOR International Incorporated. September 11. <br /> The Traverse Group Inc. 1989. Technical Report and Assessment of Soil and Groundwater <br /> Contamination. Prepared for All-Pure Chemical Company. July 29. <br /> Well Destruction Work Plan 7 May 2026 <br />