Laserfiche WebLink
PART C- HAZARD ANALYSIS and EQUIPMENT LIST(Basis for Field Team Safety Orientations and Onsite Safety Discussions) <br /> CA ONSITE TASK HAZARD ANALYSIS <br /> 1. TASKS/WORK ASPECTS 2. HAZARDS/RISKS 3. CONTROLS/SAFE WORK PRACTICES <br /> a. Mobilization to the Site with proper - Work delays -Be aware of site requirements and responsibilities including safety, labor,and PPE(see Section D.1) <br /> equipment and supplies - Improper work performance Review THAs <br /> - Routine driving Use routine safe/defensive driving practices(seat belts,safe speeds,eyes ahead, no tailgating, limit <br /> - Unfamiliar location distractions,no cell phone use while driving,clear windows,account for weather/road conditions,adequate <br /> sleep,other measures as appropriate). Plan the travel route before driving. <br /> C.2.SAFETY EQUIPMENT LIST <br /> D.1 BASELINE HAZARD PREPAREDNESS <br /> b.Set up work areas - Injury or exposure to public or other -Wear safety vest at all times;configure work area and support vehicles to minimize worker exposure to <br /> on-site personnel traffic hazards. In the public right of way,use traffic control to direct traffic around work area. <br /> - Slips/trips/falls Route pedestrians and public around work area. <br /> - Traffic hazards Walk slowly,eliminate distractions and look ahead while walking. <br /> - Special traffic hazards Hire a flagger to manage rail traffic. <br /> D.1. BASELINE HAZARD PREPAREDNESS <br /> D.2 SPECIAL TRAFFICNEHICLE/TRANSPORTHAZARDS <br /> c.Outdoor work on UPRR right of - Traffic hazards -Wear safety vest at all times.Within the railroad right of way,use railroad-approved flagmen to redirect train <br /> way and on orchard access roads - Heat stress traffic around work area. <br /> - Biting/stinging insects Stay hydrated,wear sunscreen,take frequent breaks in shade/cool location,as necessary. <br /> - Special traffic hazards Be aware of the potential for ticks,stinging/biting insects(e.g. bees),and poisonous plants.Steer clear if <br /> observed.Wear long pants and long sleeves. <br /> -When working near a railway,wear a safety vest at all times and work with a designated flagger from the <br /> operating railroad to redirect train traffic around work area. <br /> -Maintain 360-degree awareness and multiple senses for train hazards(i.e.,look and listen). Do not cross <br /> train tracks if the view downline is obstructed at all <br /> -Geosyntec staff will receive Union Pacific Roadway Worker Protection training before start of the work. <br /> C.2.SAFETY EQUIPMENT LIST <br /> D.1 BASELINE HAZARD PREPAREDNESS <br /> D.2 SPECIAL TRAFFICNEHICLE/TRANSPORT HAZARDS <br /> D.1 3. INFECTIOUS/PATHOGENIC BIOHAZARDS <br /> E.2.OTHER WORKER EXPOSURE MONITORING/SAMPLING <br /> d.Grouting - Head/eye injury -An 811 ticket will be submitted. No mechanical drilling or excavation will be performed.A Kinder Morgan <br /> - Hand injury representative may be onsite to observe the well destruction. <br /> Wear head and eye protection,as specified. <br /> Geosyntec° Task/Project Name: Well Decommissioning/Former Olin Chlor Alkali Site,Tracy THA ver.4.0 <br /> THA Date: 5/12/2026 Page 3 <br /> consultants <br />