Laserfiche WebLink
"NORMAL OPERATION"OF ❑Follow"normal operation"requirements: <br /> ELECTRICAL EQUIPMENT CONNECTED • All electrical enclosures/guards/covers must be in place/closed/secured. <br /> TO AC OR DC POWER SOURCE>50 V: • Electrical equipment maintained per codes/standards/manufacturer's recommendations. <br /> Electrically powered tools,equipment, • Ensure no indication of damage or impending failure(heat,smoke,buzzing,odors,arcing,melting). <br /> machinery,extension cords,portable • Operate equipment in accordance with manufacturer's standard operating procedures. <br /> generators,working near electrical ❑Follow general electrical safety work practices to minimize shock hazard and secondary hazards: <br /> equipment. • Control water-related/wet-location hazards in a manner appropriate for the job tasks/equipment/tool. <br /> I Never touch electrical equipment if you are wet or standing/kneeling in water or on wet surfaces. <br /> Hazards: • Use extension cords/power cords properly,rated for use conditions and current draw,prevent damage. <br /> -Electrical shock Inspect tool/equipment/extension cords/power cords before each use;remove from use if damaged. <br /> -Fire Hazard I • Use GFCI-protected outlet or portable GFCI in wet/moist locations,outdoors,basements,concrete floors. <br /> -Secondary hazards(falls,other • Do not enter any space delineated by an electrical approach boundary. <br /> injuries). <br /> HANDS-ON DIAGNOSTICS/REPAIR ON i ❑Implement electrical safe work practices pertaining to: <br /> CIRCUIT(S)CONNECTED TO POWER • Workers trained appropriately for the task. <br /> SOURCE<50 V: • Shock prevention measures. <br /> ❑AC ❑DC I • Eye/skin protection for arcing hazards. <br /> ❑Battery and/or solar power I • Protection from secondary hazards. <br /> ❑Capacitor(s) <br /> ❑Stray voltage from soil electrodes <br /> El project-specific written"Electrical Safety Program'addressing(at a minimum): <br /> ❑ WORK WITHIN"APPROACH <br /> BOUNDARY-OF EXPOSED, • Workers trained/designated as"Qualified Electrical Workers"per NFPA 70E(US)/CSA Z462(CAN) <br /> ENERGIZED(OR POTENTIALLY • Assess risks of electrical shock(voltage levels and sources),arc flash hazard and secondary hazards. <br /> ENERGIZED)CONDUCTORS AND/OR • Affix electrical hazard warning label to electrical enclosure(s)to be accessed. <br /> CIRCUIT PARTS CONNECTED TO • Physically delineate arc flash-or limited approach boundary,whichever is farthest from hazard source. <br /> POWER SOURCE 50-600 V*: • Only"qualified"workers allowed within approach boundaries;prevent entry by non-qualified personnel. <br /> ❑AC ❑DC ❑3-phase Establish electrically safe working condition;work on live circuits prohibited(except for diagnostic testing). <br /> ❑Battery and/or solar power • Use PPE for shock/arc flash protection,as required. <br /> ❑Capacitor(s) i Use other safe procedures/equipment required for the task,such as lockout/tagout. <br /> ❑Induced voltage <br /> ❑Stray voltage>50V from soil <br /> electrodes <br /> *Working on>600 V not permitted <br /> for Geosyntec personnel <br /> ❑ LOCKOUT/TAGOUT(LO/TO)OF ElPrepare site-specific written LO/TO program,and equipment-specific written LO/TO procedures(as <br /> ELECTRICAL ENERGY To prevent applicable);implement control procedures for hazardous energy sources,provide locks/tags,train workers, <br /> unplanned start-up or release of designate"authorized"personnel,notify"affected"personnel. <br /> energy when equipment is under <br /> maintenance/repair. <br /> WARNING! Confirmed or possible ❑Follow safe work practices per D.11."Utility-Related Hazards." <br /> close proximity to OVERHEAD <br /> ELECTRICAL UTILITY LINES. <br /> HSE Program Documents:HSE SOP-434a:Overhead and Underground Utility Hazards(US-only), <br /> HSE SOP-452a:Lock-out/Tag-out(North America-only) HSE SOP-454a:General Electrical Safety(US-only) <br /> D.11. UTILITY-RELATED HAZARDS ® Applicable ❑ Not Applicable, Not Anticipated <br /> Site-Specific Notes&Clarifications:Both Geosyntec and the drilling subcontractor will submit an 811 ticket for the job.Kinder Morgan is expected to contact <br /> Geosyntec due to a suspected gas line in the vicinity. <br /> ❑ OVERHEAD,ABOVE-GROUND ElDo not cross approach boundaries with personnel or equipment;employ other appropriate precautions for <br /> UTILITIES the conditions(specify above). <br /> ❑Use additional controls,as applicable:shielding,flagging,observer/monitor,or, <br /> ❑Arrange for power company/utility owner to de-energize power line. <br /> ® UNDERGROUND UTILITIES ®Confirm appropriate underground utility clearance procedures have been completed prior to ground <br /> penetrations,and employ other utility clearance/locator practices,as appropriate for conditions. <br /> ®Hand digging/augering or vacuum post-holing within 3'of utility locations or other high-risk condition. <br /> HSE Program Documents:HSE SOP-434a:Overhead and Underground Utility Hazards(US-only) <br /> D.12. CONFINED/ENCLOSED SPACES(Including Hazardous Indoor Spaces) ❑Applicable I�IC Not Applicable, Not Anticipated <br /> D.13. INFECTIOUS/PATHOGENIC BIOHAZARDS ® Applicable — Not Applicable, Not Anticipated <br /> Site-Specific Notes&Clarifications:Biting/stinging insects <br /> ® HAZARD TYPE: ❑Follow internal guidance for mitigating airborne respiratory illness transmission(as applicable). <br /> Project/Task Name:Well Decommissioning/Former Olin Chlor Alkali Site,Tracy <br /> Geosyntec THA Date:5/12/2026 Page 10 <br /> consultants <br />