My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STATEN ISLAND
>
32319
>
2900 - Site Mitigation Program
>
PR0545608
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2026 2:09:29 PM
Creation date
7/22/2026 11:57:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0545608
PE
2950 - ENVIRON ASSESS
FACILITY_ID
FA0025871
FACILITY_NAME
STATEN ISLAND MULTI-BENEFIT WETLAND RESTORATION FEASIBILITY STUDY
STREET_NUMBER
32319
Direction
N
STREET_NAME
STATEN ISLAND
STREET_TYPE
RD
City
THORNTON
Zip
95686
APN
069020190
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
32319 N STATEN ISLAND RD THORNTON 95686
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4"PVC embedded (feet) <br /> _2 <br /> Work Plan—Well Construction cover w/cap <br /> This is an addendum to the Work Plan which will describe the well construction and methods. <br /> Please see"Staten Multibenefit Monitoring Plan—Section 4:Subsidence"for site history,purpose,and PVC Casing -1 <br /> scope of the proposed project as it relates to the proposed monitoring wells. Above Ground <br /> Please we HydroFocus Health and Safety for the health and safety plan. annular seal-cement <br /> A well construction schematic and a site map is provided with the application materials. ■ bentonite <br /> Land Surface o <br /> LJ Sch.40 1.5"pvc casing <br /> Well Construction ® sand filter pack <br /> A 6"borehole will be dug using a 6"hand auger to a depth of 6ft below the ground surface.The well 6"Dia Borehole—� <br /> casing will consist of 1.5"Sch.40 PVC that will extend from the bottom of the borehole to 211 above ® 0.020 slotted screen <br /> ground surface.The casing will be screen with 0.020 slot size from depths 3-5ft.The casing will be fitted 1 <br /> with an endcap at the bottom of the borehole. <br /> The filter pack will consist of#3 Sand placed via tremie pipe.The filter pack will fill depths 2-6ft.A <br /> bentonite grout using medium bentonite ships will be used as the transitional seal filling the annual space <br /> from depths 1-211.Neat cement,mixed according to CA Well Standards Bulletin 74-90,will fill the Z <br /> remaining annual seal to the ground surface,depths 0-Ift. <br /> A capped 4"PVC cover will be fitted over the exposed well casing and into the neat cement seal to <br /> protect the exposed well casing.The top of the well casing will be fitted with a locking cap. <br /> Excavated material and other waste generated from the well construction will he collected by field <br /> personnel for proper disposal off-site. <br /> 3 <br /> Measurements and Samples <br /> No groundwater samples are planned to be taken from the wells. <br /> 4 <br /> Groundwater levels will be recorded periodically with an electric sounding instrument.In-Situ TROLL <br /> transducers will be deployed in each well for continuous water level monitoring for the duration of the <br /> project. <br /> :.:•:•:�'•'•'•' 5 <br /> PVC end cap <br />
The URL can be used to link to this page
Your browser does not support the video tag.