My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SANTA FE
>
23569
>
2900 - Site Mitigation Program
>
PR0544529
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2026 12:16:07 PM
Creation date
7/23/2026 12:06:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0544529
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0025316
FACILITY_NAME
FORMER RANCH MARKET
STREET_NUMBER
23569
STREET_NAME
SANTA FE
STREET_TYPE
RD
City
RIVERBANK
Zip
95367
APN
249070120
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
23569 SANTA FE RD RIVERBANK 95367
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r A <br /> Health and Safety Plan <br /> October 25,2018 <br /> Page 3 <br /> The Site Safety Officer shall review with all personnel and subcontractors the equipment inspection checklist <br /> for company vehicles. The Site Safety Officer shall also confirm that adequate water is available at the drill <br /> rig for emergency decontamination and washing in case a worker is exposed to contaminated water or soil. <br /> Field vehicles shall park in an area that is a safe distance from operating equipment and vehicle traffic <br /> with the location approved by the Site Safety Officer. Care must be given when approaching heavy <br /> equipment. Personnel on foot should approach from a direction facing the operator and not a blind side. <br /> Eye-to-eye contact should be made before proceeding within the working limits of the operator and their <br /> heavy equipment. <br /> 2.6 OVERHEAD HAZARDS <br /> Overhead hazards include utility lines and trees. Prior to performing work requiring the operation of <br /> equipment above eye level,the evaluation of overhead hazards shall be made. Equipment shall be located <br /> to maximize the clearance from overhead hazards(minimum 10 feet clearance). <br /> 2.7 UNDERGROUND UTILITIES <br /> Condor personnel have contacted Underground Service Alert prior to drilling activities. A private utility <br /> locator will also be used prior to investigation activities. The approximate location of underground <br /> utilities shall be marked on the existing ground surface. A minimum of 3 feet clearance shall be given to <br /> marked utilities. If drilling near utilities is required, hand excavation and probing shall be performed in 6- <br /> inch intervals prior to drilling. <br /> 2.8 MOVING AND ROTATING MACHINERY <br /> Excavation activities involve the use of large, heavy, moving and rotating equipment. Loose fitting <br /> clothing that can be caught or snagged should be avoided. Working gloves should be worn while working <br /> with moving metal parts and equipment. <br /> 3.0 PHYSICAL HAZARDS <br /> 3.1 TRIP AND SLIP PROTECTION <br /> Good housekeeping shall be maintained at the site to prevent trip and slip hazards. <br /> 3.2 HEAT STRESS <br /> Heat stress will be a hazard during hot weather and will be intensified when personnel are in protective <br /> clothing (if necessary). To prevent heat stress, personnel will be required to take breaks as needed, and <br /> consume adequate quantities of liquid. <br /> 4.0 BIOLOGICAL HAZARDS <br /> 4.1 STINGING INSECTS <br /> Care should be exercised to avoid bees,yellow jackets, or other stinging or biting insects. <br /> CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.