My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SANTA FE
>
23569
>
2900 - Site Mitigation Program
>
PR0544529
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2026 12:16:07 PM
Creation date
7/23/2026 12:06:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0544529
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0025316
FACILITY_NAME
FORMER RANCH MARKET
STREET_NUMBER
23569
STREET_NAME
SANTA FE
STREET_TYPE
RD
City
RIVERBANK
Zip
95367
APN
249070120
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
23569 SANTA FE RD RIVERBANK 95367
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment A <br /> AS-1 will be over-drilled to a depth of 45 feet with an 8-inch diameter hollow stem auger; the <br /> created hole will be filled with neat cement grout. V-1 through V-10 will be over-drilled to a depth <br /> of 30 feet with an 8-inch diameter hollow stem auger; the created hole will be filled with neat <br /> cement grout. S-1 through S-15, and S-17, will be pressure grouted to total depth (43-45 feet) <br /> and then over-drill the upper 5 feet; the created hole will be filled with neat cement grout. All wells <br /> will be completed to existing surface conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.