My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SANTA FE
>
23569
>
2900 - Site Mitigation Program
>
PR0544529
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2026 12:16:07 PM
Creation date
7/23/2026 12:06:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0544529
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0025316
FACILITY_NAME
FORMER RANCH MARKET
STREET_NUMBER
23569
STREET_NAME
SANTA FE
STREET_TYPE
RD
City
RIVERBANK
Zip
95367
APN
249070120
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
23569 SANTA FE RD RIVERBANK 95367
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONDOR EARTH TECHNOLOGIES,INC. GENERAL HEALTH& SAFETY PLAN <br /> FOR WORKING WITH PETROLEUM HYDROCARBONS, <br /> ORGANIC VAPORS AND LIQUID CONTAMINANTS <br /> 1.0 INTRODUCTION <br /> Condor Earth (Condor) has adopted the following Health & Safety Plan for working with petroleum <br /> hydrocarbons, organic vapors, and liquid contaminants that may be encountered during investigative <br /> excavation and sampling operations. Condor technicians will employ photoionization detector (PID) <br /> organic vapor monitoring technology to monitor exposure in order to meet Short Term Exposure Limit <br /> (STEL) requirements. The purpose of this plan is to provide health and safety precautions for the initial <br /> and subsequent site visits until the nature and magnitude of the contaminants have been evaluated. <br /> All work will be done in general accordance with current OSHA regulations and all personnel working <br /> within the exclusion zone at the project site will have completed a 40-hour OSHA training course. A <br /> tailgate safety meeting will be held prior to commencement of work each day and a Health& Safety Plan <br /> will be discussed with and presented to all crewmembers for their signatures. <br /> This Health & Safety Plan is limited to provisions for safe work practices related to exposure to <br /> petroleum products in soil. The suspected contaminants are listed on the contact information page. <br /> 2.0 GENERAL SAFETY MEASURES <br /> Access to the project site shall be limited by the exclusion zone. The exclusion zone shall include an area <br /> at least ten feet from the sampling location and sampling equipment. Non-authorized personnel shall not <br /> be allowed in the exclusion zone.No smoking will be allowed in the exclusion zone. <br /> All Condor personnel, subcontractors, and consultants shall adhere to the provisions of the Condor Site <br /> Safety Plan including all applicable elements of the Condor Illness and Injury Prevention Program(IIPP). <br /> All of the above personnel who participate in fieldwork at the site will attend a safety indoctrination <br /> provided by the Condor Site Safety Officer. The Condor Site Safety Plan is maintained in this work plan. <br /> Copies of this work plan shall be available to all working units of Condor,its subcontractors and consultants. <br /> 2.1 SITE SAFETY OFFICER RESPONSIBILITIES <br /> The Site Safety Officer shall monitor all activities of equipment and personnel at the project site. Site <br /> Safety Officer responsibilities will include the following: <br /> l. Limiting access to the exclusion zone to authorized personnel. <br /> 2. Providing written log of on-site activities and events. <br /> 3. Notification of regulatory agencies during emergency procedures. <br /> 4. Enforcement of contaminant exposure site safety precautions. <br /> 5. Document all injuries and safety incidents. <br /> During investigation in soils containing petroleum hydrocarbons, all personnel shall undertake the <br /> following precautions: <br /> 2.2 AMBIENT AIR MONITORING/RESPIRATOR REQUIREMENTS <br /> Benzene, a constituent of gasoline, will be used as an indicator parameter for ambient air monitoring. <br /> Because benzene is a suspected carcinogen and, therefore, highly regulated, it will be.useful as a <br /> *Slk'4_0� <br /> CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.