Laserfiche WebLink
is � <br /> • <br /> Work Plan for Destruction of <br /> Soil Vapor Extraction and Sparge Wells <br /> Former Ranch Market,Riverbank CA <br /> Page 4 <br /> 6.3 DESTRUCTION OF VAPOR EXTRACTION WELLS <br /> The former air sparge test well (AS-1) was completed to a depth of approximately 45 feet bgs within the <br /> footprint of the former USTs with the filter pack placed between approximately 38 and 45 feet bgs. The soil <br /> vapor extraction wells (V-1 through V-10) were completed to a depth of approximately 30 feet bgs with <br /> the filter pack placed between approximately 11 and 30 feet bgs. The former air sparge well and vapor <br /> extraction wells will be destroyed by removing the well box, over-drilling the bore-hole and removing all <br /> material within the original bore-hole, including the well casing, filter pack, and annular seal, and <br /> completely filling the created hole with neat cement grout. The grout will be placed in one continuous <br /> operation if possible and the volume of neat cement grout will be recorded for each well. Any groundwater <br /> displaced from the wells will be collected and contained in DOT-approved drums, sealed, labeled, and <br /> characterized for disposal. Well construction details for the air sparge test well and soil vapor extraction <br /> wells, as well as the expected grout needed to fill each over-drilled bore hole, are included in the table <br /> below. <br /> Well Construction Details—Air Sp ar a Test Well and Soil Vapor Extraction Wells <br /> Boring Casing Total Sand Pack Depth Estimated Neat <br /> Diameter Diameter Depth Interval Cement <br /> (inches) (inches) (feet) (feet below surface) (gallons) <br /> AS-1 8 2 45 38-45 117 <br /> V-1 8 2 30 11-30 78 <br /> V-2 8 2 30 11-30 78 <br /> V-3 8 2 30 11-30 78 <br /> V-4 8 2 30 11-30 78 <br /> V-5 8 2 30 11-30 78 <br /> V-6 8 2 30 11-30 78 <br /> V-7 8 2 30 11-30 78 <br /> V-8 8 2 30 11-30 78 <br /> V-9 8 2 30 11-30 78 <br /> V-10 8 2 30 11-30 78 <br /> 6.4 DESTRUCTION OF AIR SPARGE WELLS <br /> Each of the bore holes for the twenty sparge wells at the Site were drilled to a depth of between 43 <br /> feet bgs and 45 feet bgs.The sparge wells themselves were constructed with 0.75-inch diameter PVC <br /> casing and 1.25-inch sparge points installed to a depth of approximately 41.5 feet.The annulus around <br /> the PVC casing for each well consist of a filter pack from approximately 37 feet bgs to the bottom of <br /> the bore hole (between 43 and 45 feet bgs), bentonite seal from approximately 35 feet bgs to <br /> approximately 37 feet bgs, and neat cement grout from the ground surface to approximately 35 feet <br /> bgs. A review of the well logs indicate that the filter pack intervals in every sparge well (-37-45 feet <br /> bgs) correspond to sandy soil, and all but well S-9 was reported as grading to gravel and cobbles at <br /> the bottom of each bore hole(please see Appendix E). <br /> Due to the difficulty with over-drilling small diameter wells,the 0.75-inch diameter sparge wells will <br /> be destroyed by pressure grouting the casing, followed by over-drilling the upper five feet of the <br /> ;�� CONDOR <br />