My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
2325
>
2200 - Hazardous Waste Program
>
PR0544860
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2026 2:43:56 PM
Creation date
7/27/2026 2:40:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0544860
PE
2220 - SM HW GEN <5 TONS/YR
FACILITY_ID
FA0025494
FACILITY_NAME
MEDLINE INDUSTRIES (MANTECA CA)
STREET_NUMBER
2325
Direction
W
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
2325 W LOUISE AVE MANTECA 95337
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Large Quantity Hazardous Waste Generator Program Inspection Report <br />Date: <br />July 8, 2026 <br />Facility Address: <br />2325 W LOUISE AVE, MANTECAMEDLINE INDUSTRIES (MANTECA CA) <br />Facility Name: <br />Environmental Health Department <br />SUMMARY OF VIOLATIONS <br />(CLASS I, CLASS II, or MINOR - Notice to Comply) <br />Item #Remarks <br />Inspector Phone: <br />(209) 616-3064 <br />Inspector: <br />Maria Lopez, EHS <br />Date: 7/8/2026 <br />Printed Name and Title: <br />Crystal De Los Reyes, <br />Environmental Contact <br />Received by: <br />AFTER THE COMPLIANCE DATE, EHD WILL BILL FOR ALL TIME AND ACTIVITIES ASSOCIATED WITH BRINGING THIS <br />FACILITY BACK INTO COMPLIANCE. <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />Overall Inspection Comments <br />An inspection checklist was provided to the facility operator at the time of inspection. The inspector will provide a <br />complete report to the facility operator within the next few weeks. Complete and submit a copy of the Return to <br />Compliance Certification form to the EHD with a statement documenting the corrective actions that have been or will <br />be taken for each violation, and any supporting paperwork, within 30 days of receiving the complete inspection report. <br />1868 E. Hazelton Avenue | Stockton, California 95205 | T 209 468-3420 | F 209 464-0138 | www.sjgov.org/EHD <br />Page 5 of 5EHD - CUPA Inspection Report IS03 <br />CP25 - HW LQG <br />7/8/2026FA0025494 PR0544860 4671004
The URL can be used to link to this page
Your browser does not support the video tag.