Laserfiche WebLink
f. 3ft3 of 3.5" dia plastic, random dump packing, loaded at <br /> factory <br /> g. 4" S40 PVC interconnecting piping from mist eliminator <br /> outlet to carbon vessel inlet included <br /> PART 3 EXECUTION <br /> 3.1 GENERAL <br /> A. Install in accordance with Manufacturer's written instructions. <br /> B. The Contractor shall give the Manufacturer 15 full working days' notice <br /> prior to requested start-up/training date (if option is included). <br /> 3.2 INSTALLATION <br /> A. Install all equipment and media in accordance with the manufacturer's <br /> written instructions and recommendations. <br /> 3.3 OPTIONAL MANUFACTURER'S SERVICES <br /> A. The manufacturer can offer the following services, if requested: <br /> 1. One (1) trip, one (1) day on site for start-up, commissioning, and <br /> operator training <br /> 2. Certificate of proper installation and commissioning report. <br /> 3. Additional on-site assistance is available for an additional charge. <br /> END OF SECTION <br /> 6 of 6 <br />