Laserfiche WebLink
PA-2400377 (C) Early Consultation, SU-2400278 Page 2 of 3 <br /> 4103 N. Zuckerman Rd., Stockton December 9, 2024 <br /> In addition, show on revised plans that the disposal field area will be barricaded so it cannot <br /> be driven over, parked on, or used as a storage area. This disposal field area must be used <br /> for that specific purpose only, and it cannot contain any underground utility lines(San Joaquin <br /> County Development Title, Section 9-605.010(c)(3)(5)). <br /> Note: Sewage disposal system shall meet minimum set back from septic system as stated <br /> in (San Joaquin County Onsite Wastewater Treatment System Table 1.5). <br /> 5) Applicant shall contact Natalia Subbotnikova, Program Coordinator, Small Public Water <br /> System Program, at (209) 468-0338, to determine if the existing well can be permitted as a <br /> public water system prior to issuance of building permits. If a public water system is required, <br /> applicant shall submit a Small Public Water System preliminary technical report to the <br /> California State Water Resources Control Board, Division of Drinking Water (Water Board) <br /> at least six months before initiating construction of any water related improvement, as <br /> defined. The issuance of a permit to operate a small public water system by the local primacy <br /> agency(EHD) is prohibited without the concurrence of the Water Board. Please contact Gena <br /> Farley with the SWRCB Division of Drinking Water at Gena.Farley@waterboards.ca.gov or <br /> 209-948-7488, concerning the requirements for preliminary technical report submittal prior to <br /> issuance of building permits. <br /> If the Water Board determines that an onsite well shall be used as the potable water source, <br /> a permit application to operate Small Public Water System shall be submitted to the EHD <br /> for approval prior to issuance of building permits. To issue a permit to operate, concurrence <br /> from the Water Board is required. A yearly permit to operate a public water system will be <br /> required by the EHD prior to sign off of the certificate of final occupancy(San Joaquin County <br /> Development Title, Section 9-602.010 and 9-601.030.). <br /> The supplier must possess adequate financial, managerial, and technical capability to <br /> assure delivery of pure, wholesome, and potable drinking water in accordance with San <br /> Joaquin County Development Title, Sections 9-602.010 and 9-601.030 and C.C.R., Title 22, <br /> and Health and Safety Code, Section 116525 116570. <br /> 6) The existing private water wells shall be tested for the chemical Dibromochloropropane <br /> (DBCP) and nitrates with the results submitted to the Environmental Health Department prior <br /> to issuance of building permit(s). Samples are to be taken and analyzed by a State-approved <br /> laboratory (San Joaquin County Development Title, Section 9-601.0200)). <br /> 7) Construction of an individual domestic water well under permit and inspection by the <br /> Environmental Health Department is required at the time of development (San Joaquin <br /> County Development Title, Section 9-601.010 (b)). <br /> 8) Before any hazardous materials/waste can be stored or used onsite, the owner/operator must <br /> report the use or storage of these hazardous materials to the California Environmental <br /> Reporting System (CERS) at cers.caler)a.ca.gov/and comply with the laws and regulations <br /> for the programs listed below (based on quantity of hazardous material in some cases). The <br /> applicant may contact the Program Coordinator of the CUPA program, Elena Manzo (209) <br /> 953-7699, with any questions. <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sigov.org/ehd <br />