Laserfiche WebLink
DISCHARGE <br />ELEVATION <br />117 FT 00 IN <br />DEPTI <br />(4X, 2" PROJECTION) <br />NOTES: <br />1. LOCATE ANCHOR BOLTS USING CLEAR INSIDE <br />EDGE OF ACCESS FRAME AND CENTER LINE <br />OF PUMP AS REF. POINT. BOLT LOCATIONS <br />MUST BE HELD TO MAINTAIN EXACT POSITION <br />OF PUMP RELATIVE TO ACCESS FRAME. <br />2. GROUT OPENING FOR ACCESS FRAME. <br />3. COVER SHOWN IS FOR STANDARD DUTY <br />FRAME. FOR ADDITIONAL DIMENSIONS ON <br />STANDARD DUTY TROUGH FRAME, HEAVY DUTY <br />ANGLE FRAME AND HEAVY DUTY TROUGH FRAME, <br />CONSULT ITT FLYGT CORP. ENGINEERING DEPT. <br />4. FOR PUMP DIMENSIONS REFER TO DIMENSIONAL <br />DRAWING. <br />w <br />0 <br />c <br />m <br />oq <br />REDUCER <br />BACKFLOW PREVENTER <br />IN I I <br />I� II <br />II <br />II <br />f <br />II <br />UTILITY STATION 16.5' —a I <br />----- <br />rr ii <br />M _ OI II,I <br />COUPLING <br />4",4"x4" TEE <br />4" SFM (DIP) <br />.INV. 8'x8'x8" CONC. <br />SLAB <br />1/2" EXP JT FILLER FOR <br />CONC. (BITUMINOUS TYPE) <br />LOCKING ALUMINUM <br />ACCESS HATCH <br />4" GATE VALVE (TYP) J <br />4" CHECK VALVE (TYP.) <br />2" <br />5'x5'x4' CONC. <br />VAULT <br />NOTES: <br />NON -SHRINK GROUT <br />FOR VALVE VAULT <br />PENETRATIONS (TYP) <br />TOP VIEW <br />1. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY CONSTRUCTION PERMITS, APPROVALS AND <br />LICENSES PRIOR TO BEGINNING CONSTRUCTION. <br />CABLE HOLDER <br />8'x8'x12" CONC. <br />SLAB <br />FURTHEST PROTRUSION <br />37 OF ACCESS FRAME <br />FROM CENTER OF PIT. <br />2. PUMPS P1 AND P2 SHALL BE SUBMERSIBLE SEWAGE PUMPS EACH RATED AT A DESIGN POINT OF <br />112 GPM ® 23' TDH AT A MINIMUM EFFICIENCY OF 357 WITH A 4" DISCHARGE AND A 3 HP MOTOR. <br />MOTORS SHALL BE 3 PHASE, 4 POLE, 240 VAC DESIGNED FOR SUBMERSIBLE WASTEWATER SERVICE. <br />PUMPS SHALL BE MANUFACTURED BY FLYGT. (CP 3085) <br />3. GUIDE RAILS AND LIFTING DEVICES SUITABLE FOR WET PIT INSTALLATION AS INDICATED ON <br />DRAWINGS. CONTRACTORS SHALL PROVIDE TYPE 316 STAINLESS STEEL GUIDE RAILS, WALL SUPPORTS, <br />LIFTING CHAIN, ANCHOR BOLTS, AND FASTENERS. PROVIDE A FORGED STEEL "GRIP -EYE" FOR USE <br />WITH MECHANICAL LIFTING DEVICE. SYSTEM SHALL BE APPROPRIATELY SIZED FOR WEIGHT OF PUMPS <br />TO BE LIFTED. <br />4. ACCESS FRAMES AND COVERS SHALL HAVE STAINLESS STEEL COMPRESSION SPRING ASSIST, <br />STAINLESS STEEL LIFTING HANDLES, HINGES, AND ATTACHING HARDWARE, STAINLESS STEEL LOOKING <br />ASSEMBLY, BUILT-IN NEOPRENE GASKET, 300 LBS PSF LOAD RATING, ACCESS HATCHES AS <br />MANUFACTURED BY FLYGT, HALLIDAY PRODUCTS OR EQUAL. <br />5. THE FOLLOWING NOTES DESCRIBE THE MINIMUM REQUIREMENTS FOR A PAD MOUNTED, STANDBY <br />RATED, 20 KW-60HZ CONTINUOUS DUTY, THREE PHASE DIESEL/ELECTRIC GENERATOR. THE DIESEL <br />GENERATOR SHALL BE MANUFACTURED BY GENERAC, KOHLER, ONAN OR EQUAL. <br />A. DIESEL GENERATOR SHALL INCLUDE A DIESEL ENGINE, CONTROL & INSTRUMENTAL PANEL, <br />BATTERIES, REMOTE MOUNTED BATTERY CHARGER, BRUSHLESS ALTERNATOR, EXCITOR, VOLTAGE <br />REGULATOR, GENERATOR MAIN BREAKER, SKID MOUNTED FUEL TANK, FUEL PUMP, RADIATOR, BLOWER <br />FAN, VIBRATION ISOLATORS, JACKET WATER HEATER, WEATHERPROOF (LOCKING TYPE) ENCLOSURE, <br />DOUBLE WALL BASE TANK (WITH ALARM) AND 24 HOURS MINIMUM FUEL STORAGE. <br />B. THE BATTERY CHARGER SHALL BE PROVIDED IN A SEPARATE NEMA 3R ENCLOSURE INSIDE THE <br />GENERATOR HOUSING. <br />C. THE DIESEL GENERATOR SHALL BE DELIVERED AS A SKID MOUNTED UNIT, PIPED AND WIRED FOR <br />OPERATION. <br />D. INSTALL A STEEL REINFORCED CONCRETE PAD ADEQUATELY SIZED TO SUPPORT THE DIESEL <br />GENERATOR FUEL TANK AND ASSOCIATED EQUIPMENT AS PART OF THIS SCOPE OF WORK. <br />BEFORE YOU DIG <br />CALL USA UNDERGROUND SERVICE ALERT <br />48 HOURS PRIOR TO CONSTRUCTION. CALL <br />TOLL FREE 1-800-227-2600 <br />KEEP ALL VEHICLES, EQUIPMENT, TOOLS AND <br />PEOPLE 10 FEET FROM POWER LINES, IF YOU <br />MUST WORK WITHIN 10 FEET OF POWER LINES <br />PLEASE CALL PG&E ® 800-743-5000 <br />DESCRIPTION <br />2.75, <br />45" DIA. OF ACCESS FRAME <br />GROUT 3/4" ANCHOR <br />CIRCLE a BOLT (8x) <br />REF. POINT <br />`4" PL� TYP. <br />T � <br />PUMP AND <br />UPPER GUIDE <br />BAR BRACKET <br />CL PIT TYP. <br />9.875" <br />BASE SECTION <br />DILLON & MURPHY <br />CONSULTING CIVIL ENGINEERS <br />ENGINEERING " PLANNING • SURVEYING <br />1820 W. KETTLEMAN LANE, SUITE E, LODI, CALIFORNIA 95242 (209) 334-6613 <br />SANITARY SEWER LIFT STATION <br />CARBONA STATION <br />DETAIL SHEET <br />OCTOBER, 2003 <br />SAN JOAQUIN COUNTY <br />��AL¢: BENCH MARK:B@=42. EL:13A.58 SHEET <br />DRAWN BY: SM/EK DESCRIPTION: 26 <br />DESIGNED BY: JMBRASS CAP S/W CORNER OF OF 27 SHEETS <br />CONCRETE CULVERT 114' NORTH <br />CHECKED BY: CD OF LINNE RD, ON THE WEST SIDE JOB NO. <br />OF MAC ARTHUR DRIVE, 0005 <br />AS BUILT BY: <br />