My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU-2943
PublicWorks
>
VAULT MAPS
>
Subdivision - SU (GIS FILES)
>
SU-2913-3074
>
SU-2943
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 9:50:08 AM
Creation date
10/15/2024 9:50:07 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C6 <br />I <br />co <br />IN FROM BUFFER - <br />TANK <br />TO SLUDGE <br />BED <- — <br />F 4. OVERFLOW TO SLUDGE BED <br />------------------- <br />/ <br />4IfF4TION T4NK 11'2" AIR LINE <br />/ <br />/ <br />4_ 1 <br />i <br />4 • -- - <br />3' <br />fi LENT AFTA <br />-------------- <br />MLT PUMP <br />G" <br />DIS PUMP <br />3. <br />SLR I I 3 5LR2 I <br />PUMP ! �\ PUMP / <br />Cf lAMBE:F, // <br />\ <br />n p p 5NT PUMP�i� <br />03INJECT � --- <br />03PUMP <br />PLANT PIPING <br />1'4'=1'-O" C500E) <br />ROSE'S ENGINEERING - GEOLOGY & SURVEY INC. <br />9070 ELK GROVE BLVD. ELK GROVE, CALIFORNIA 95624 <br />(916) 686-5445 <br />LAYOUT <br />LEGEND <br />MLT <br />SNT <br />SLR <br />DIS <br />AGR <br />DIS <br />NIXED LIQUOR TRANSFER <br />SUPERNATANT TRANSFER <br />SLUDGE RETURN <br />DISCI-tARGE <br />AERATION <br />I I <br />GC)�JFD ESSOF,\ <br />L4B -�- <br />OFFIGE <br />NOTE: <br />SEE SHEET P-1 FOR <br />PLANT DRAIN + WATER <br />SUPPLY LINES <br />PROJECT: <br />WASTEWATER AND RECLAMATION SYSTEM <br />FRENCH CAMP GOLF & RV PARK <br />FRENCH CAMP CA <br />SHEET TITLE: <br />PLANT PIPING <br />AND VALVES <br />1. DRAWINGS ARE DIAGRAMATIC IN NATURE AND ARE NOT <br />INTENDED TO BE AN EXACT REPRESENTATION Of THE FINAL <br />PRODUCT. <br />2. ALL POSITIONS AND LOCATIONS ARE APPROXIMATE ONLY. <br />CONTRACTOR TO VERIFY ACTUAL CONDITIONS AND <br />INTERFERENCES THAT MAY EXI5T AT THE TIME OF <br />INSTALLATION AND REROUTE, RELOCATE, OR MODIFY AS <br />REQUIRED TO PROVIDE SYSTEMS CONSISTENT WITH THE INTENT <br />OF THE DESIGN. <br />3. CONTRACTOR TO VERIFY ALL ROUTINGS AND DIMEN5IONS FOR <br />DISCREPANCIES BEFORE BEGINNING ANY WORK. ALL PLUMBING <br />WORK TO CONFORM TO UPC 1994 REQUIREMENTS. <br />4. COORDINATE ALL WORK WITH OTHER CONTRACTORS. <br />5. ALL PIPES CONNECTION TO TANKS TO BE OF SCHEDULE 80 <br />G. ALL JOINTS ON SCHEDULE 40 PIPE TO BE Of SCHEDULE 80 <br />7. ALL RIGID P.V.G. PIPE SHALL BE GUT. MADE UP, AND INSTALLED <br />IN ACCORDANCE WITH THE PIPE MANUFACTURERS RECOMMENDATIONS <br />SURVEYED BY: <br />DRAWN BY: <br />DESIGNED BY: <br />CHECKED BY: <br />RWF <br />JWF <br />_. RPR__ <br />DATE: -__ SEP, 94 <br />SCALE: AS NOTED <br />SHEET No. <br />P-7 <br />OF /— <br />
The URL can be used to link to this page
Your browser does not support the video tag.