GENERAL NOTES: <br />1. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE EFFECTIVE FOR THE DURATION OF THE <br />C0NS7RUC7ION ACTIVITY. <br />2. NO STORM RUNOFF WATER SHALL BE ALLOWED TO DR41N DIRECTLY INTO THE EXISTING UNDERGROUND <br />STORM SYSTEM BEFORE THE ON-SRE S70RM DRAIN SYSTEM IS INSTALLED. <br />3 AS SOON AS IS PRACTICAL AFTER THE NEW ON-SITE STORM DRAIN SYSTEM /S INSTALLED, THE CATCH <br />BASINS SHALL BE INSTALLED AND GRAVEL BAGS AND SCREENS SHALL BE PLACED AROUND THE CATCH <br />BASINS, AS SHOWN. THE CONTRACTOR SHALL HAVE AN OP770N TO INSTALL PREFABRICATED STEEL <br />FRAMES W77H FILTER SCREEN OF FILTER FABRIC ATTACHED 70 THE FRONT OF THE DRAIN INLET AND <br />EXTEND 12 INCHES ((12" ON EACH SIDE OF THE DR41N INLET OPENING. FRAME SHALL BE APPROVED <br />BY THE CITY ENGINEER AND SHALL FIT THE OPENING W17H LESS THAN ONE-OUARTER INCH (1/41) <br />GAP AT ANY ONE POINT <br />4. THE NAM& ADDRESS AND 24-HOUR TELEPHONE NUMBER OF THE PERSON RESPONSIBLE FOR <br />IMPLEMENTATION OF THE EROSION AND SEDIMENTA77ON CONTROL PLAN SHALL BE PROVIDED. <br />5. A MINIMUM OF 50' OF DRAIN ROCK, 1-112" DAME/ER OR LARGER, AT A MINIMUM DEPTH OF 6" <br />SHALL BE INSTALLED AT EACH DRIVEWAY CE 70 THE S1TE. THIS DOES NOT NEED 70 BE DONf <br />AT DRIVEWAYS, WHICH WILL BE CLOSED BY IMMOVABLE BARRICADES DURING CONSTRUCTION. <br />6. ALL EROSION AND SEDIM/ENTA77ON CONTROL MEASURES SHALL BE MAINTAINED UN77L DISTURBED <br />AREAS ARE STABILIZED. CHANGES 70 THE EROSION AND SEDIMENTATION CONTROL PLAN STALL BE <br />MADE TO MEET FIELD CONDITION$ BUT ONLY WITH THE APPROVAL OF OR AT THE OREC77ON OF THE <br />C/IY ENGINEER <br />7. DURING THE RAINY SEASON ALL SIDEWALK AND PAVED AREAS SHALL BE KEPT CLEAR OF EARTH <br />M47ER14L AND DEBRIS THE S/Tf SHALL BE MAINTAINED SO AS 70 MINIMIZE SEDIMENT LADEN RUNOFF <br />FROM ENTERING ANY STORM DRAINAGE SYSTEM. <br />8. 7HE EROSION AND SEDIMENTA77ON CONTROL PLAN COVERS ONLY THE FIRST WINTER DURING WHICH <br />CONSTRUCTION /S 70 TAKE PLACE. PLANS ARE 70 BE RESUBA6TTED PRIOR 70 SHP7EMBER 1 OF EACH <br />SUBSEQUENT YEAR UNTIL THE CITY ACCEPTS THE SITE IMPROVEMENTS: <br />9. R IS THE RESPONSIBILITY OF THE CONTRACTOR TO INSPECT AND REPAIR ALL EROSION CONTROL <br />FACILITIES AT 7HE END OF EACH WOW DAY DURING THE RAINY SEASON. <br />10. R s THE RESPONSIBILITY OF THE CONTRACTOR TO CLEAN OUT SEDIMENT BASINS WHENEVER THE <br />LEVEL OF SEDIMENT REACHES THE SEDIMENT CLEAN OUT LEVEL INDICATED ON THE PLANS <br />11. R /S THE RESPONSIBILITIES OF THE CONTRACTOR 70 PROTECT TEMPORARY BORROW AREAS AND/OR <br />STOCKPILES WITH APPRLIPRI47E EROSION CONTROL MEASURES SA77SFAC70RY TO THE CITY ENGINEER <br />12. THE CLEAN/NG OF PAVED STREETS, DURING AND AT THE COMPLETION OF CONS7RUC770N, SHALL BE <br />PERFORMED WITH MECHANMAL SWEEPERS THE USE OF WA7ER TRUCKS TO '1YASH DOWN" THE STREET <br />IS PROHIBITED. <br />13 SEAL OR SKIRT BETWEEN TRAILER & GRADING 70 PREVENT EXPOSURE TO DR41N <br />14. 7HE FOLLOWING PLANS ARE ACCURATE FOR EROSION CONTROL PURPOSES ONLY. <br />15. THE INFORMATION ON THIS PLAN /S INTENDED TO BE USED AS A GUIDELINE FOR THE CONTRACTOR <br />AND SU6CONIAC70RS TO COMPLY WRH THE REQUIREMENTS OF THE STATE WATER RESOURCES CONTROL <br />BOARD. FIELD CON0I7TONS MAY NECESSIT47E MODIFIC177ONS 70 THIS PLAN. <br />16. NO ON-SITE FUELING SHALL TAKE PLACE. <br />'ROLL OR F/! <br />1. INSPECT AND REPAIR ROLL AFTER EACH STORM EVENT AND REMOVE SEDIMENT WHEN NECESSARY. <br />2 REMOVED SEDIMENT SHALL BE DEPOSITED 70 AN AREA THAT WILL NOT CONTRIBUTE SEDIMENT <br />OFF-SITE AND CAN BE PERMANENTLY STABILIZED. <br />4 t/- <br />1" Xf" X 1B" WOOD STAKES <br />AT f0' O.C. OR AS NECESSARY <br />NOTE - <br />1. 57R4W ROLL INSTALLATION REQUIRES THE <br />PLACEMENT AND SECURE STAKING OF THE ROLL <br />IN A TRENCH, 3"--5" (75-125mm) DEEP. <br />RUNOFF MUST NOT BE ALLOWED TO RUN <br />UNDER OR AROUND ROLL. <br />STRAW ROLLS <br />NTS <br />O l A"., <br />°UF W 70 PROFILE VIEW <br />AR 3401 WITH <br />MIN. 7EWLE STRENGTH <br />OF 135pyi. d SIEVE <br />OPENING 70-100) <br />PROVIDETRANSITION <br />BETWEEN STABILIZED <br />CONS7RUCTON ENIRAN'C£ <br />AND PUBLIC RIW <br />EX/STING GROUND <br />PLAN VIEW <br />NTS <br />DIVERSION RIDGE <br />TO CONTAIN WATER <br />WITHIN CONSTRUCTUN <br />AREA <br />rING <br />IND <br />GROUND <br />1. THE Al47ERLAL FOR CONSMUC77ON OF 7HE STABILIZED CONSTRUCTION ENTRANCE SHALL BE 2 70 3 INCH STONE. <br />2. THE THICKNESS OF THE PAD SHALL NOT BE LESS THAN 6 INCHES <br />J. THE WIDTH OF THE PAD SHALL NOT BE LESS THAN THE FULL WIDTH OF ALL Po/ OF INGRESS OR EGRESS, OR 30' MIN. <br />4. THE LENGTH OF THE PAD SHALL BE AS REQUIRED, BUT NOT LESS THAN 50 FEET. <br />5. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION THAT WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC <br />RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC 70P DRESSING *nHI ADDITIONAL STONE AS CONDITIONS DEM410D, AND REPAIR <br />AND/OR CLEAN OUT ANY MEASURES USED 70 TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO <br />PUaX RIGHT-OF-WAY SHALL BE REMOVED IMMED147ELY. <br />6. WHEN NECESSARY, WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO PUBLIC RIGHT-OF-WAY. <br />WHEN WASHING /S REQUIRED. lT SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE THAT DRAINS INTO AN <br />APPROVED SEDIMENT TRAP, OR SEDIMENT BASIN. ALL SEDIMENT SlW BE PREVENTED FROM ENTERING ANY STORM DRAIN, DITCH, <br />OR WATERCOURSE THROUGH USE OF SAN094GS, GRAVEL, BEARDS, OR OTHER APPROVED METHODS <br />7. C0NR4C7OR TO REMOVE AND DISPOSE OF STAB/UZ£D CONSTRUCTION ENTRANCE UPON COMPLEIINV OF CONSTRUCTION. <br />BINDING WIRE <br />OR TWINE <br />CMURETE SLURRY WASTES <br />1. PCC AND AC WASTE SHALL NOT BE ALLOWED TO ENTER STORM DRAINS OR WATERCOURSES <br />2 PCC AND AC WASTE SHALL BE COLLECTED AND DISPOSED OF OUTSIDE THE HIGHWAY RIGHT-OF-WAY <br />IN CONFORMANCE W17H SECTION 7-1.13 OF STANDARD SPEC/FI4T70NS OR PLACED IN A TEMPORARY <br />CONCRETE WASHOUT FACILITY. <br />3 DISPOSAL OF HARDENED PCC AND AC WASTE SHALL BE INCONFORMANCE W17H SEC77ON 15-3.02 OF <br />THE STANDARD SPEC/FIC4770NS <br />4. A SIGN SHALL BE INSTALLED ADJACENT 70 EACH TEMPORARY CONCRETE WASHOUT FACILITY To INFORM <br />CONCRETE EQUIPMENT OPERATORS 70 U77LIZE THE PROPER FACILITIES. <br />5. DO NOT ALLOW SLURRY RESIDUE FROM/ WET CORING OR SAW -CUTTING AC OR PCC 70 ENTER STORM <br />DRAINS OR RECEIVING WATERS <br />6. VACUUM SLURRY RESIDUE AND DISPOSE IN A 7EMPORARY PIT (AS DESCRIBED /N ON-SI7E 7EXIPORARY <br />CONCRETE WASHOUT FACILITY, CONCRETE TRANSIT TRUCK WASHOUT PROCEDURES, BELOW) AND ALLOW <br />SLURRY 70 DRY. DISPOSE OF DRY SLURRY RESIDUE IN ACCORDANCE WITH BMP WW -5, "SOLID WASTE <br />MANAGEMENT'; OR, FOR ON-SITE DISPOSAL, IN ACCORDANCE N77H S7ANa4RO SPECIFTC4770N 15-302, <br />REMOVAL METHODS <br />7. COLLECT RESIDUE FROM GROOVING AND GRINDING a%RATONS /N ACCORDANCE W/TH STAND4RD <br />SPECIFICATIONS SECTION 42-1.02 AND 42-2.02, "CONS717UC7TON " <br />1. TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE LOC47ED A MINIMUM OF 15 M (50 FT) FROM <br />STORM DRAIN INLETS, OPEN DRAINAGE FACILITIES, AND WATERCOURSES, UNLESS DETERMINED UNFEASIBLE <br />BY THE ENGINEER. EACH FACILITY SHALL BE LOCATED AWAY FROM CONSTRUCTION TRAFFIC OR ACCESS <br />AREAS 70 PREVENT DISTURBANCE OR TRACKING <br />2. A SIGN SHALL BE INSTALLED ADJACENT 70 EACH WASHOUT FACILITY TO INFORM CONCRETE EQUIPMENT <br />OPERATORS 70 UTILIZE THE PROPER FACILITIES THE SIGN SHALL BE INSTALLED AS SHOWN ON THE <br />PLANS AND IN CONFORMANCE WITH THE PROVISIONS IN SEC77ON 56-2, "ROADSIDE SIGNS" OF THE <br />STANDARD SPECIFICATIONS <br />3. TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE CONSTRUCTED ABOVE GRADE. TEMPORARY <br />CONCRETE WASHOUT FACILITIES SHALL BE CONSTRUCTED AND MAINTAINED /N SUFFICIENT QUANTITY AND <br />SIZE TO CONTAIN ALL LIQUID AND CONCRETE WASTE GENERATED BY WASHOUT OPERATIONS. <br />4. TEMPORARY WASHOUT FACILITIES SHALL HAVE A TEMPORARY PIT OR BERMED AREAS OF SUFFACIENT <br />VOLUME 70 COMPLETELY CONTAIN ALL LIQUID AND WASTE CONCRETE M47FIWS GENERATED DURING <br />WASHOUT PROCEDURES <br />5. PERFORM W45HIOUT OF CONCRETE TRUCKS IN DESIGNATED AREAS ONLY. <br />6. ONCE CONCRETE WASTES ARE WASHED INTO THE DESIGAATED AREA AND ALLOWED TO HARDEN, THE <br />CONCRETE SHALL BE BROKEN UP, REMOVED, AND DISPOSED OF PER BMP W7M-5, "SOLID WASTE <br />AUNAGEMENT', AND IN CONFORM WE WITH THE PROVISIONS IN SECTION 15-3.02, "REMOVAL METHODS" <br />OF THE STANDARD SPECIFICATIONS DISPOSE OF HARDENED CONCRETE ON A REGULAR BASIS <br />TEMPORARY CONCRETE NSHOUT FACILITY (T)TE ABOVE" O&fj <br />-TEMPORARY CONCRETE WASHOUT FACILITY (TYPE ABOVE GRADE) SHALL BE CONSTRUCTED AS SHOWN ON <br />THE PLANS, WITH A RECOMMENDED MINIMUM LENGTH AND MINIMUM WIDTH OF 3 M ((10 FEET)), BUT WITH <br />SUFFICIENT QUANTITY AND VOLUME 70 CONTAIN ALL LIQUID AND CONCRETE WASTE' GENERATED BY WASHOUT <br />OPERATIONS. THE LENGTH AND WIDTH OF A FACILITY MAY BE INCREASED, AT THE CONTRACTOR'S EXPENSE, <br />UPON APPROVAL OF THE ENGINEER. <br />-PLASTIC LINING MATERIAL SHALL BE A MINIMUM OF 60 ML POLYETHYLENE SHEETING AND SHALL BE FREE <br />OF HOLES, 75M OR OTHER DEFECTS THAT COMPROMISE 7HE IMPERMEABILITY OF THE MATERIAL <br />-PORTABLE DELINEA70RS SHALL CONFORM 70 THE PROVISIONS W SECTION 12-3.04, "PORTABLE <br />DELINEATORS'; OF THE STANDARD SPECIFICATIONS. THE DELINEATOR BASES SHALL BE CEMENTED TO <br />THE PAVEMENTIN THE SAME RUNNER AS PROVIDED FOR CEMENTING PAVEMENT MARKERS TO PAVEMENT <br />IN SECTION 85-1.06, "PLACEMENT'; OF THE STANDARD SPECIFICATIONS PORTABLE DELINEATORS SHALL <br />BE APPLIED ONLY 70 A CLEAN, DRY SURFACE. <br />1. WHEN TEMPORARY CONCRETE WASHOUT FACILITIES ARE NO LONGER REQUIRED FOR THE WORK, AS <br />DEIERAIINED BY THE ENGINEER, THE HARDENED CONCRETE SHALL BE REMOVED AND DISPOSED OF IN <br />CONFORMANCE W77H THE PROVISIONS /N SEC77ON 15-3.02 OF THE STAND4RD SPECIFICATIONS. M47ERALS <br />USED 70 CONSTRUCT TEMPORARY CONCRETE WASHOUT FACIU77ES SHALL BECOME THE PROPERTY OF THE <br />CONTRACTOR, SHALL BE REMOVED FROM THE SITE OF THE WORK, AND SHALL BE DISPOSED OF OUTSIDE <br />THE HIGHWAY RIGHT-OF-WAY IN CONFORMANCE WITH THE PROVISIONS IN SECTION 7-1.13 OF THE <br />STANDARD SPECIFICATIONS <br />2. HOLES, DEPRESSIONS OR OTHER GROUND DISTURBANCE CAUSED BY THE REMOVAL OF THE TEMPORARY <br />CONCRETE WASHOUT FACIU71ES SHALL BE BACKFILLED AND REPAIRED IN CONFORMANCE WITH 7HE <br />PROVISIONS IN SECTION 15-1.02 "PRESERVATION OF PROPERTY", OF THE STANDARD SPECIFICA70NS <br />3. THE CONTRACTOR'S W457E POLLUTION CONTROL MANAGER (WPCM) SHALL MONITOR ON SIZE' CONCRETE <br />WASTE STORAGE AND DISPOSAL PROCEDURES AT LEAST WEEKLY. <br />4. THE *PCM SHALL MONITOR CONCRETE WORKING TASKS. SUCH AS SAW CUTTING, CORING, GRINDING <br />AND GROOVING AT LEAST WEEKLY TO ENSURE PROPER METHODS ARE EMPLOYED. <br />5. TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE AUINTAMED 70 PROVIDE ADEQU47E HOLDING <br />CAPACITY W7/H A MINIMUM FREEBOARD OF 4" FOR ABOVE GRADE FACIL177ES AND 12" FOR BELOW GRADE <br />FACILITIES MAINTAINING TEMPORARY CONCRETE WASHOUT FACILITIES SHALL INCLUDE REMOVING AND <br />DISPOSING OF HARDENED CONCRETE AND RETURNING THE FACILITIES 70 A FUNCTIONAL COND17701V <br />HARDENED CONCRETE MATERIALS SHALL BE REMOVED AND DISPOSED OF /N CONFORMANCE WITH THE <br />PROVISIONS IN SECTION 15-3.02, "REMOVAL METHODS" OF THE STANDARD SPECIFICAWNS. <br />6. EXISTING FACIL117ES MUST BE CLEANED, OR NEW FACIL177ES MUST BE CONS7RUC7ED AND READY FOR <br />USE ONCE THE WASHOUTS 75X FULL <br />2 X 2 WOOD STAKE <br />0 24" D.C. <br />STAKED AND ENTRENCHED <br />S7RAW BALE <br />ML POLYETHYLENE <br />10' MIN <br />CONCRETE WASHOUT AREA <br />NTS <br />CONCRETE WASHOUT SHALL BE REMOVED <br />PRIOR TO LEVEL REACHING TOP OF <br />STRAW BALES <br />DIRT BERM (TVP.) <br />COPYRIGHTO 2006 MCR ENGINEERING <br />15 <br />mi m <br />J 0 <br />z ` Q <br />r <br />0 <br />Z °u O <br />!!ww O <br />ui <br />00CC <br />J <br />Lu Z <br />43 <br />SHEET <br />14 <br />OF 21 SHEETS <br />nnn <br />a <br />0 <br />W <br />e <br />a <br />I <br />g <br />c <br />o <br />15 <br />mi m <br />J 0 <br />z ` Q <br />r <br />0 <br />Z °u O <br />!!ww O <br />ui <br />00CC <br />J <br />Lu Z <br />43 <br />SHEET <br />14 <br />OF 21 SHEETS <br />a <br />0 <br />W <br />e <br />a <br />I <br />g <br />c <br />o <br />15 <br />mi m <br />J 0 <br />z ` Q <br />r <br />0 <br />Z °u O <br />!!ww O <br />ui <br />00CC <br />J <br />Lu Z <br />43 <br />SHEET <br />14 <br />OF 21 SHEETS <br />