GENERAL NOTES:
<br />1. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE EFFECTIVE FOR THE DURATION OF THE
<br />C0NS7RUC7ION ACTIVITY.
<br />2. NO STORM RUNOFF WATER SHALL BE ALLOWED TO DR41N DIRECTLY INTO THE EXISTING UNDERGROUND
<br />STORM SYSTEM BEFORE THE ON-SRE S70RM DRAIN SYSTEM IS INSTALLED.
<br />3 AS SOON AS IS PRACTICAL AFTER THE NEW ON-SITE STORM DRAIN SYSTEM /S INSTALLED, THE CATCH
<br />BASINS SHALL BE INSTALLED AND GRAVEL BAGS AND SCREENS SHALL BE PLACED AROUND THE CATCH
<br />BASINS, AS SHOWN. THE CONTRACTOR SHALL HAVE AN OP770N TO INSTALL PREFABRICATED STEEL
<br />FRAMES W77H FILTER SCREEN OF FILTER FABRIC ATTACHED 70 THE FRONT OF THE DRAIN INLET AND
<br />EXTEND 12 INCHES ((12" ON EACH SIDE OF THE DR41N INLET OPENING. FRAME SHALL BE APPROVED
<br />BY THE CITY ENGINEER AND SHALL FIT THE OPENING W17H LESS THAN ONE-OUARTER INCH (1/41)
<br />GAP AT ANY ONE POINT
<br />4. THE NAM& ADDRESS AND 24-HOUR TELEPHONE NUMBER OF THE PERSON RESPONSIBLE FOR
<br />IMPLEMENTATION OF THE EROSION AND SEDIMENTA77ON CONTROL PLAN SHALL BE PROVIDED.
<br />5. A MINIMUM OF 50' OF DRAIN ROCK, 1-112" DAME/ER OR LARGER, AT A MINIMUM DEPTH OF 6"
<br />SHALL BE INSTALLED AT EACH DRIVEWAY CE 70 THE S1TE. THIS DOES NOT NEED 70 BE DONf
<br />AT DRIVEWAYS, WHICH WILL BE CLOSED BY IMMOVABLE BARRICADES DURING CONSTRUCTION.
<br />6. ALL EROSION AND SEDIM/ENTA77ON CONTROL MEASURES SHALL BE MAINTAINED UN77L DISTURBED
<br />AREAS ARE STABILIZED. CHANGES 70 THE EROSION AND SEDIMENTATION CONTROL PLAN STALL BE
<br />MADE TO MEET FIELD CONDITION$ BUT ONLY WITH THE APPROVAL OF OR AT THE OREC77ON OF THE
<br />C/IY ENGINEER
<br />7. DURING THE RAINY SEASON ALL SIDEWALK AND PAVED AREAS SHALL BE KEPT CLEAR OF EARTH
<br />M47ER14L AND DEBRIS THE S/Tf SHALL BE MAINTAINED SO AS 70 MINIMIZE SEDIMENT LADEN RUNOFF
<br />FROM ENTERING ANY STORM DRAINAGE SYSTEM.
<br />8. 7HE EROSION AND SEDIMENTA77ON CONTROL PLAN COVERS ONLY THE FIRST WINTER DURING WHICH
<br />CONSTRUCTION /S 70 TAKE PLACE. PLANS ARE 70 BE RESUBA6TTED PRIOR 70 SHP7EMBER 1 OF EACH
<br />SUBSEQUENT YEAR UNTIL THE CITY ACCEPTS THE SITE IMPROVEMENTS:
<br />9. R IS THE RESPONSIBILITY OF THE CONTRACTOR TO INSPECT AND REPAIR ALL EROSION CONTROL
<br />FACILITIES AT 7HE END OF EACH WOW DAY DURING THE RAINY SEASON.
<br />10. R s THE RESPONSIBILITY OF THE CONTRACTOR TO CLEAN OUT SEDIMENT BASINS WHENEVER THE
<br />LEVEL OF SEDIMENT REACHES THE SEDIMENT CLEAN OUT LEVEL INDICATED ON THE PLANS
<br />11. R /S THE RESPONSIBILITIES OF THE CONTRACTOR 70 PROTECT TEMPORARY BORROW AREAS AND/OR
<br />STOCKPILES WITH APPRLIPRI47E EROSION CONTROL MEASURES SA77SFAC70RY TO THE CITY ENGINEER
<br />12. THE CLEAN/NG OF PAVED STREETS, DURING AND AT THE COMPLETION OF CONS7RUC770N, SHALL BE
<br />PERFORMED WITH MECHANMAL SWEEPERS THE USE OF WA7ER TRUCKS TO '1YASH DOWN" THE STREET
<br />IS PROHIBITED.
<br />13 SEAL OR SKIRT BETWEEN TRAILER & GRADING 70 PREVENT EXPOSURE TO DR41N
<br />14. 7HE FOLLOWING PLANS ARE ACCURATE FOR EROSION CONTROL PURPOSES ONLY.
<br />15. THE INFORMATION ON THIS PLAN /S INTENDED TO BE USED AS A GUIDELINE FOR THE CONTRACTOR
<br />AND SU6CONIAC70RS TO COMPLY WRH THE REQUIREMENTS OF THE STATE WATER RESOURCES CONTROL
<br />BOARD. FIELD CON0I7TONS MAY NECESSIT47E MODIFIC177ONS 70 THIS PLAN.
<br />16. NO ON-SITE FUELING SHALL TAKE PLACE.
<br />'ROLL OR F/!
<br />1. INSPECT AND REPAIR ROLL AFTER EACH STORM EVENT AND REMOVE SEDIMENT WHEN NECESSARY.
<br />2 REMOVED SEDIMENT SHALL BE DEPOSITED 70 AN AREA THAT WILL NOT CONTRIBUTE SEDIMENT
<br />OFF-SITE AND CAN BE PERMANENTLY STABILIZED.
<br />4 t/-
<br />1" Xf" X 1B" WOOD STAKES
<br />AT f0' O.C. OR AS NECESSARY
<br />NOTE -
<br />1. 57R4W ROLL INSTALLATION REQUIRES THE
<br />PLACEMENT AND SECURE STAKING OF THE ROLL
<br />IN A TRENCH, 3"--5" (75-125mm) DEEP.
<br />RUNOFF MUST NOT BE ALLOWED TO RUN
<br />UNDER OR AROUND ROLL.
<br />STRAW ROLLS
<br />NTS
<br />O l A".,
<br />°UF W 70 PROFILE VIEW
<br />AR 3401 WITH
<br />MIN. 7EWLE STRENGTH
<br />OF 135pyi. d SIEVE
<br />OPENING 70-100)
<br />PROVIDETRANSITION
<br />BETWEEN STABILIZED
<br />CONS7RUCTON ENIRAN'C£
<br />AND PUBLIC RIW
<br />EX/STING GROUND
<br />PLAN VIEW
<br />NTS
<br />DIVERSION RIDGE
<br />TO CONTAIN WATER
<br />WITHIN CONSTRUCTUN
<br />AREA
<br />rING
<br />IND
<br />GROUND
<br />1. THE Al47ERLAL FOR CONSMUC77ON OF 7HE STABILIZED CONSTRUCTION ENTRANCE SHALL BE 2 70 3 INCH STONE.
<br />2. THE THICKNESS OF THE PAD SHALL NOT BE LESS THAN 6 INCHES
<br />J. THE WIDTH OF THE PAD SHALL NOT BE LESS THAN THE FULL WIDTH OF ALL Po/ OF INGRESS OR EGRESS, OR 30' MIN.
<br />4. THE LENGTH OF THE PAD SHALL BE AS REQUIRED, BUT NOT LESS THAN 50 FEET.
<br />5. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION THAT WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC
<br />RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC 70P DRESSING *nHI ADDITIONAL STONE AS CONDITIONS DEM410D, AND REPAIR
<br />AND/OR CLEAN OUT ANY MEASURES USED 70 TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO
<br />PUaX RIGHT-OF-WAY SHALL BE REMOVED IMMED147ELY.
<br />6. WHEN NECESSARY, WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO PUBLIC RIGHT-OF-WAY.
<br />WHEN WASHING /S REQUIRED. lT SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE THAT DRAINS INTO AN
<br />APPROVED SEDIMENT TRAP, OR SEDIMENT BASIN. ALL SEDIMENT SlW BE PREVENTED FROM ENTERING ANY STORM DRAIN, DITCH,
<br />OR WATERCOURSE THROUGH USE OF SAN094GS, GRAVEL, BEARDS, OR OTHER APPROVED METHODS
<br />7. C0NR4C7OR TO REMOVE AND DISPOSE OF STAB/UZ£D CONSTRUCTION ENTRANCE UPON COMPLEIINV OF CONSTRUCTION.
<br />BINDING WIRE
<br />OR TWINE
<br />CMURETE SLURRY WASTES
<br />1. PCC AND AC WASTE SHALL NOT BE ALLOWED TO ENTER STORM DRAINS OR WATERCOURSES
<br />2 PCC AND AC WASTE SHALL BE COLLECTED AND DISPOSED OF OUTSIDE THE HIGHWAY RIGHT-OF-WAY
<br />IN CONFORMANCE W17H SECTION 7-1.13 OF STANDARD SPEC/FI4T70NS OR PLACED IN A TEMPORARY
<br />CONCRETE WASHOUT FACILITY.
<br />3 DISPOSAL OF HARDENED PCC AND AC WASTE SHALL BE INCONFORMANCE W17H SEC77ON 15-3.02 OF
<br />THE STANDARD SPEC/FIC4770NS
<br />4. A SIGN SHALL BE INSTALLED ADJACENT 70 EACH TEMPORARY CONCRETE WASHOUT FACILITY To INFORM
<br />CONCRETE EQUIPMENT OPERATORS 70 U77LIZE THE PROPER FACILITIES.
<br />5. DO NOT ALLOW SLURRY RESIDUE FROM/ WET CORING OR SAW -CUTTING AC OR PCC 70 ENTER STORM
<br />DRAINS OR RECEIVING WATERS
<br />6. VACUUM SLURRY RESIDUE AND DISPOSE IN A 7EMPORARY PIT (AS DESCRIBED /N ON-SI7E 7EXIPORARY
<br />CONCRETE WASHOUT FACILITY, CONCRETE TRANSIT TRUCK WASHOUT PROCEDURES, BELOW) AND ALLOW
<br />SLURRY 70 DRY. DISPOSE OF DRY SLURRY RESIDUE IN ACCORDANCE WITH BMP WW -5, "SOLID WASTE
<br />MANAGEMENT'; OR, FOR ON-SITE DISPOSAL, IN ACCORDANCE N77H S7ANa4RO SPECIFTC4770N 15-302,
<br />REMOVAL METHODS
<br />7. COLLECT RESIDUE FROM GROOVING AND GRINDING a%RATONS /N ACCORDANCE W/TH STAND4RD
<br />SPECIFICATIONS SECTION 42-1.02 AND 42-2.02, "CONS717UC7TON "
<br />1. TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE LOC47ED A MINIMUM OF 15 M (50 FT) FROM
<br />STORM DRAIN INLETS, OPEN DRAINAGE FACILITIES, AND WATERCOURSES, UNLESS DETERMINED UNFEASIBLE
<br />BY THE ENGINEER. EACH FACILITY SHALL BE LOCATED AWAY FROM CONSTRUCTION TRAFFIC OR ACCESS
<br />AREAS 70 PREVENT DISTURBANCE OR TRACKING
<br />2. A SIGN SHALL BE INSTALLED ADJACENT 70 EACH WASHOUT FACILITY TO INFORM CONCRETE EQUIPMENT
<br />OPERATORS 70 UTILIZE THE PROPER FACILITIES THE SIGN SHALL BE INSTALLED AS SHOWN ON THE
<br />PLANS AND IN CONFORMANCE WITH THE PROVISIONS IN SEC77ON 56-2, "ROADSIDE SIGNS" OF THE
<br />STANDARD SPECIFICATIONS
<br />3. TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE CONSTRUCTED ABOVE GRADE. TEMPORARY
<br />CONCRETE WASHOUT FACILITIES SHALL BE CONSTRUCTED AND MAINTAINED /N SUFFICIENT QUANTITY AND
<br />SIZE TO CONTAIN ALL LIQUID AND CONCRETE WASTE GENERATED BY WASHOUT OPERATIONS.
<br />4. TEMPORARY WASHOUT FACILITIES SHALL HAVE A TEMPORARY PIT OR BERMED AREAS OF SUFFACIENT
<br />VOLUME 70 COMPLETELY CONTAIN ALL LIQUID AND WASTE CONCRETE M47FIWS GENERATED DURING
<br />WASHOUT PROCEDURES
<br />5. PERFORM W45HIOUT OF CONCRETE TRUCKS IN DESIGNATED AREAS ONLY.
<br />6. ONCE CONCRETE WASTES ARE WASHED INTO THE DESIGAATED AREA AND ALLOWED TO HARDEN, THE
<br />CONCRETE SHALL BE BROKEN UP, REMOVED, AND DISPOSED OF PER BMP W7M-5, "SOLID WASTE
<br />AUNAGEMENT', AND IN CONFORM WE WITH THE PROVISIONS IN SECTION 15-3.02, "REMOVAL METHODS"
<br />OF THE STANDARD SPECIFICATIONS DISPOSE OF HARDENED CONCRETE ON A REGULAR BASIS
<br />TEMPORARY CONCRETE NSHOUT FACILITY (T)TE ABOVE" O&fj
<br />-TEMPORARY CONCRETE WASHOUT FACILITY (TYPE ABOVE GRADE) SHALL BE CONSTRUCTED AS SHOWN ON
<br />THE PLANS, WITH A RECOMMENDED MINIMUM LENGTH AND MINIMUM WIDTH OF 3 M ((10 FEET)), BUT WITH
<br />SUFFICIENT QUANTITY AND VOLUME 70 CONTAIN ALL LIQUID AND CONCRETE WASTE' GENERATED BY WASHOUT
<br />OPERATIONS. THE LENGTH AND WIDTH OF A FACILITY MAY BE INCREASED, AT THE CONTRACTOR'S EXPENSE,
<br />UPON APPROVAL OF THE ENGINEER.
<br />-PLASTIC LINING MATERIAL SHALL BE A MINIMUM OF 60 ML POLYETHYLENE SHEETING AND SHALL BE FREE
<br />OF HOLES, 75M OR OTHER DEFECTS THAT COMPROMISE 7HE IMPERMEABILITY OF THE MATERIAL
<br />-PORTABLE DELINEA70RS SHALL CONFORM 70 THE PROVISIONS W SECTION 12-3.04, "PORTABLE
<br />DELINEATORS'; OF THE STANDARD SPECIFICATIONS. THE DELINEATOR BASES SHALL BE CEMENTED TO
<br />THE PAVEMENTIN THE SAME RUNNER AS PROVIDED FOR CEMENTING PAVEMENT MARKERS TO PAVEMENT
<br />IN SECTION 85-1.06, "PLACEMENT'; OF THE STANDARD SPECIFICATIONS PORTABLE DELINEATORS SHALL
<br />BE APPLIED ONLY 70 A CLEAN, DRY SURFACE.
<br />1. WHEN TEMPORARY CONCRETE WASHOUT FACILITIES ARE NO LONGER REQUIRED FOR THE WORK, AS
<br />DEIERAIINED BY THE ENGINEER, THE HARDENED CONCRETE SHALL BE REMOVED AND DISPOSED OF IN
<br />CONFORMANCE W77H THE PROVISIONS /N SEC77ON 15-3.02 OF THE STAND4RD SPECIFICATIONS. M47ERALS
<br />USED 70 CONSTRUCT TEMPORARY CONCRETE WASHOUT FACIU77ES SHALL BECOME THE PROPERTY OF THE
<br />CONTRACTOR, SHALL BE REMOVED FROM THE SITE OF THE WORK, AND SHALL BE DISPOSED OF OUTSIDE
<br />THE HIGHWAY RIGHT-OF-WAY IN CONFORMANCE WITH THE PROVISIONS IN SECTION 7-1.13 OF THE
<br />STANDARD SPECIFICATIONS
<br />2. HOLES, DEPRESSIONS OR OTHER GROUND DISTURBANCE CAUSED BY THE REMOVAL OF THE TEMPORARY
<br />CONCRETE WASHOUT FACIU71ES SHALL BE BACKFILLED AND REPAIRED IN CONFORMANCE WITH 7HE
<br />PROVISIONS IN SECTION 15-1.02 "PRESERVATION OF PROPERTY", OF THE STANDARD SPECIFICA70NS
<br />3. THE CONTRACTOR'S W457E POLLUTION CONTROL MANAGER (WPCM) SHALL MONITOR ON SIZE' CONCRETE
<br />WASTE STORAGE AND DISPOSAL PROCEDURES AT LEAST WEEKLY.
<br />4. THE *PCM SHALL MONITOR CONCRETE WORKING TASKS. SUCH AS SAW CUTTING, CORING, GRINDING
<br />AND GROOVING AT LEAST WEEKLY TO ENSURE PROPER METHODS ARE EMPLOYED.
<br />5. TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE AUINTAMED 70 PROVIDE ADEQU47E HOLDING
<br />CAPACITY W7/H A MINIMUM FREEBOARD OF 4" FOR ABOVE GRADE FACIL177ES AND 12" FOR BELOW GRADE
<br />FACILITIES MAINTAINING TEMPORARY CONCRETE WASHOUT FACILITIES SHALL INCLUDE REMOVING AND
<br />DISPOSING OF HARDENED CONCRETE AND RETURNING THE FACILITIES 70 A FUNCTIONAL COND17701V
<br />HARDENED CONCRETE MATERIALS SHALL BE REMOVED AND DISPOSED OF /N CONFORMANCE WITH THE
<br />PROVISIONS IN SECTION 15-3.02, "REMOVAL METHODS" OF THE STANDARD SPECIFICAWNS.
<br />6. EXISTING FACIL117ES MUST BE CLEANED, OR NEW FACIL177ES MUST BE CONS7RUC7ED AND READY FOR
<br />USE ONCE THE WASHOUTS 75X FULL
<br />2 X 2 WOOD STAKE
<br />0 24" D.C.
<br />STAKED AND ENTRENCHED
<br />S7RAW BALE
<br />ML POLYETHYLENE
<br />10' MIN
<br />CONCRETE WASHOUT AREA
<br />NTS
<br />CONCRETE WASHOUT SHALL BE REMOVED
<br />PRIOR TO LEVEL REACHING TOP OF
<br />STRAW BALES
<br />DIRT BERM (TVP.)
<br />COPYRIGHTO 2006 MCR ENGINEERING
<br />15
<br />mi m
<br />J 0
<br />z ` Q
<br />r
<br />0
<br />Z °u O
<br />!!ww O
<br />ui
<br />00CC
<br />J
<br />Lu Z
<br />43
<br />SHEET
<br />14
<br />OF 21 SHEETS
<br />nnn
<br />a
<br />0
<br />W
<br />e
<br />a
<br />I
<br />g
<br />c
<br />o
<br />15
<br />mi m
<br />J 0
<br />z ` Q
<br />r
<br />0
<br />Z °u O
<br />!!ww O
<br />ui
<br />00CC
<br />J
<br />Lu Z
<br />43
<br />SHEET
<br />14
<br />OF 21 SHEETS
<br />a
<br />0
<br />W
<br />e
<br />a
<br />I
<br />g
<br />c
<br />o
<br />15
<br />mi m
<br />J 0
<br />z ` Q
<br />r
<br />0
<br />Z °u O
<br />!!ww O
<br />ui
<br />00CC
<br />J
<br />Lu Z
<br />43
<br />SHEET
<br />14
<br />OF 21 SHEETS
<br />
|