My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2023_PS-2301501 thru PS-2302000_ - PS-2301692
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2023
>
PS-2301501 thru PS-2302000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2023_PS-2301501 thru PS-2302000_ - PS-2301692
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2025 8:39:56 AM
Creation date
11/12/2025 8:34:52 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2301692 R4
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2023
Location
Mariposa Road from Munford Rd. to Ball Lane
Type - Permit Process
Gas line install; paving
Address
250 Cherry Lane, Suite 208, Manteca,CA 95337
Application
Kier+ Wright Civil Engineers
Project #
PWP7110005
Type
Encroachment Permit
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ENCROACHMENT PERMIT <br /> <br />To: Kier + Wright Civil Engineers Rider #4 11/3/2025 <br />250 Cherry Lane, Suite 208 Mariposa Road Lane Closure <br />Manteca, CA 95337 from 11/3/25 to 11/21/25. <br /> <br />Permit No: PS-2301692 <br />Date Issued: 06/13/2023 <br />Start Date: 04/07/2025 <br />Exp. Date: 05/05/2025 <br />Project No. PWP7110005 <br />Extended To: 11/21/2025 <br /> <br />Encroachment Type: Gas Line Install; Paving <br />Location: Mariposa Road from Munford Rd To Ball Lane <br /> <br />In compliance with your request of 06/13/2023, permission is herebygranted to do work in County right-of-way as <br />shown on attached application and subject to all the terms, conditions and restrictions written below or printed as <br />general or special provisions on any part of this form. See reverse side and attached sheet, if any. <br /> <br />Trench excavations for service connections will not be permitted within ten feet (10') of pavement centerline <br />unless otherwise approved by the Director. Surface of trench patches shall match in kind and be smooth and <br />even with that of abutting surface. Special attention shall be given to depth of utilities through roadside area in <br />anticipation of future draining facilities, road profile and/or frontage development. All underground utility facilities <br />are to be established and accurately dimensioned on sketches from surveyed centerline of road right-of-way, or <br />from right-of-way lines. <br /> <br />Permittee shall call the Department of Public Works, Field Engineering Division (Permit Inspection) at (209) 953- <br />7421 at least two business days prior to beginning any work within the County right of way. All work performed <br />under this permit shall conform to the rules and regulations pertaining to safety established by the California <br />Division of Occupational Safety and Health (Cal -OSHA.) <br /> <br />The jobsite shall be kept in a safe condition at all times by the daily removal of any excess dirt or debris which <br />might be a hazard to either pedestrian or automobile traffic. All necessary traffic convenience and warning devices <br />and personnel shall be provided, placed and maintained by and at the sole expense of the Permittee in <br />accordance with the latest edition of the CALTRANS Manual of Uniform Traffic Control Devices. <br /> <br />After completion of the work permitted herein, all debris, lumber, barricades, or any excess material shall be <br />removed and the jobsite left in a neat workmanlike manner. Immediately following completion of construction <br />permitted herein, Permittee shall call the Department of Public Works, Field Engineering Division (Permit <br />Inspections) at (209) 953-7421 to complete the permit. <br /> <br />NON -ROAD CLOSURE PERMIT: Permittee/contractor MUST email County Field Engineering at <br />PWinspection@sjgov.org, a minimum of (2) business days prior to the start of any work within County <br />right-of-way with the permit number, and contractor's contact information. <br /> <br />Special Comments: <br />Mariposa Road Lane Closure from 10/27/2025 to 11/21/2025. See Special <br />Conditions for more details. See Rider 3 below for details <br />Forms: SS/WW, R-29, Trench Cut <br />Policy <br />Est. Permit Base Fee: No <br /> <br />Fritz Buchman, Director <br />Department of Public Works <br />By: George Montross <br />Permit Section <br />
The URL can be used to link to this page
Your browser does not support the video tag.