Laserfiche WebLink
5 <br />COUNTY OF SAN JOAQUIN <br />r+y. .4.71 • <br />DEPARTMENT OF PUBLIC WORKS <br />P.O.BOX 1810-1810 E.HAZELTON AVENUE Permit No: PS-1502456 <br />STOCKTON,CALIFORNIA 95201 Date Issued: 10/07/2015 <br />209)468-3000 Exp.Date: 10/06/2016 <br />FAX#(209)468-9324 <br />Project No: PWPI 10005 <br />APN No: 20309015 <br />DRIVEWAY ENCROACHMENT PERMIT <br />To:RAY,PATRICIA/CASEY RAY <br />16655 S.TIDE RD. <br />RIPON,CA 95366- <br />Location: E/S OF NORTH RIPON RD. 1050'S/O FRENCH CAMP RD. <br />In compliance with your request of 09/03/2015,and subject to all the terms,conditions and restrictions written below or printed as general or <br />special provisions on any part ofthis form. <br />Permission is hereby granted to construct One driveway w/o pipe shown on <br />Permit Application No. PS-1502456 Quad: SE <br />Jobsite shall be kept in a safe condition at all times by removing daily any excess dirt or debris which might be a hazard to pedestrian and/or <br />vehicular traffic. Adequate lights,signs and barricades shall be placed and maintained by the Permittee for the protection ofthe public in <br />accordance with the current Caltrans Standard Specifications. <br />A(n)(SEE STAMP) inside diameter per section 62 ofthe current Caltrans Standard Specifications,ALTERNATIVE PIPE AND PIPE <br />ARCH CULVERTS,shall be installed in roadside drainage ditch for drainage flow maintenance and shall be ofsufficient length to clear toe of <br />approach fill or headwalls. <br />The entire area of driveway approach(es),include flares for turning and/or paved frontage(s),from the edge of roadway pavement to <br />right-of-way(front property)line shall be surfaced with a two inch(2")minimum ofasphalt concrete over a(6 inch) minimum ofcompacted <br />layer ofthree-quarter inch(3/4")maximum size aggregate base material(road gravel)conforming to Class 2 Aggregate Base specified in <br />Section 26 of the current Caltrans Standard Specification,or with a four inch(4")minimum of portland cement concrete. <br />Ifportland cement concrete pavement is installed,expansion joints shall be provided at the edge ofpavement and along property line. Surface <br />grades ofapproach(es)and/or to open ends ofpipe. No ponding or puddles on pavement surface shall be allowed. <br />The field Engineering Division of this office shall receive no less than forty-eight(48)hours notice prior to beginning of any work <br />within the County right-of-way. After completion ofthe work permitted herein,all debris,lumber,barricades or any excess <br />material shall be removed and the jobsite left in a neat workmanlike condition. The Permittee shall fill out and mail notice of <br />completion provided by Grantor. <br />Driveway(s) shall be complete prior to occupancy of the residence, <br />but not to exceed expiration date. <br />Mike Selling,Deputy Director <br />Department of Public Works <br />B0, <br />1 <br />Permit section <br />FORMS: SS/WW,R-17