Laserfiche WebLink
COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />P.O.BOX 1810-1810 E.HAZELTON AVENUE <br />STOCKTON,CALIFORNIA 95201 <br />(209)468-3000 <br />FAX #(209)468-9324 <br />Permit No:PS-1600630 <br />Date Issued:03/11/2016 <br />Start Date:03/15/2016 <br />Exp.Date:08/01/2016 <br />Project No:PWP730052 <br />Quad:NW <br />UE/CRlPMNO:31l69447 <br />ENCROACHMENT PERMIT <br />To:PACIFIC GAS &ELECTRIC -STOCKTON <br />PO BOX 930 <br />STOCKTON,CA 95201 <br />Encroachment Type: <br />IPole Replacement .1_____________________", <br />Location: <br />SIS OF ARMSTRONG RD.2150'WIO DAVIS RD. <br />In compliance with your request of 03/1112016,permission is hereby granted to do work in County right-of-way as shown on attached <br />application and subject to all the terms,conditions and restrictions written below or printed as general or special provisions on any part of tius <br />fonn.See reverse side and attached sheet,if any. <br />Trench excavations for service connections will not be permitted within ten feet (10')of pavement centerline unless otherwise approved by the <br />Director.Surface oftrench patches shall match in kind and be smooth and even with that of abutting surface.Special attention shall be given <br />to depth of utilities through roadside area in anticipation of future drainage facilities,road profile and/or frontage development.All <br />underground utility facilities are to be established and accurately dimensioned on sketches from surveyed centerline of road right of way,or <br />fi'om right of way (border)lines. <br />Permittee shall call the Department of Public Works,Field Engineering Division (permit Inspections)at (209)953-7421 at least <br />forty-eight h(\urs prior to beginning any work within the County right of way.All work perfonned lmder this permit shall conform to <br />the rules and regulations pertaining to safety established by the California Division of Industrial Safety and Cal-OSHA. <br />The jobsite shall be kept in a safe condition at all times by the daily removal of any excess dirt or debris which might be a hazard to either <br />pedestrian or automobile traffic.All necessary traffic convenience and warning devices and personnel shall be provided,placed and <br />maintained by and at the sole expense ofthe Pennittee in accordance with the latest edition of the CALTRANS Manual of Traffic Control. <br />After completion of the work permitted herein,all debris,lumber,barricades,or any excess material shall be removed and thejobsite left in a <br />neat workmanlike manner.Immediately following completion of construction pennitted herein,Pennittee shaH fill out and mail notice of <br />completion (see attached post card)provided by Grantor. <br />S edal Comments: <br />Traffic Control Per MUTCD******Work with Railroad Company regarding any work and/or traffic control devices within the <br />railroad right-of-way***** <br />FORMS:ISS/WW,R-29 <br />Est.Permit Fee:$824.00 <br />KRIS BALAJI,Director <br />epartment of Public Works <br />WI-lITE <br />GOLDENROD <br />YELLOW <br />PINK <br />-Permittee <br />.PWD Central File <br />-Field Inspection <br />-PCn111tSection Section