Laserfiche WebLink
COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />P.O.BOX 1810-1810 E.HAZELTON AVENUE <br />STOCKTON,CALIFORNIA 95201 <br />(209)468-3000 <br />FAX #(209)468-9324 <br />PermilNo:PS-1602084 <br />Date Issued:07/1 8/2016 <br />StOltDale:07!J 8/2016 <br />Exp.Date:11/01/2016 <br />Project No:PWP730052 <br />Quad:NE <br />ENCROACHMENT PERMIT <br />To:PACIFIC GAS &ELECTRIC -STOCKTON <br />POBOX 930 <br />STOCKTON,CA 95201 <br />Encroachment Type: <br />(Pole Replacement <br />Location: <br />NIS OF ATKINSON RD.7 10'EIO RUTOLO RD. <br />UE/CRIPM NO:3 J 184388 <br />In compliance with your request of 07/18120]6 ,permission is hereby granted to do work in County right-of-way as shovm on attached <br />application and subject to all the terms,conditions and restrictions written below or printed as general or special provisions on any part ofthi5 <br />fOll11.See reverse side and attached sheet,if any. <br />Trench excavations for service connections will not be permitted within ten feet (10')of pavement centerl1ne unless other~lise approved by the <br />Director.Surface of trench patches shall match in kind and be smooth and even with that of abutting surface.Special attention shall be given <br />to depth of utilities through roadside area in anticipation of future drainage facilities,road profile and/or fi:ontage development.All <br />underground utility facilities are to be established and accurately dimensioned on sketches from surveyed centerline of road right of way,or <br />from right of way (border)lines. <br />Permittee shall call the Department of Public Works,Field Engineering Division (Permit Inspections)at (209)953-7421 at least <br />forty-eight hours prior to beginning any work within the County right of way.All work performed under this pel111itshall conform to <br />the rules and regulations peliaining to safety established by the California Division ofIndustrial Safety and Cal-OSHA. <br />Thejobsite shall be kept in a safe condition at all times by the daily removal of any excess dirt or debris which might be a hazard to either <br />pedestrian or automobile traffic.All necessary traffic convenience and waming devices and personnel shall be provided,placed and <br />maintained by and at the sale expense ofthe Pennittee in accordance with ti,e latest edition ofthe CALTRANS Manual of Traffic Control. <br />After completion of the work permitted herein,all debris,lumber,barrkades,or any excess material shall be removed and the jobsite left in a <br />neat workmanlike manner.lmmediately following completion of construction permitted herein,Permittee shall fill out and mail notice of <br />completion (see attached post card)provided by Grantor. <br />Special Comments:ITraffic Control Per MUTCD <br />FORMS:.lsS/WW . <br />Est.Permit Fee:$824.00 <br />WHITE <br />GOLDF.:NROD <br />YELLOW <br />PINK <br />-Permittee <br />-PWD Centra!rile <br />-Field lnspection <br />-Pemlit Section <br />By: <br />KRIS BALAJJ,Director <br />Department of Public Works <br />~