Laserfiche WebLink
July 2, 2007 <br /> NOA Project Number: E06122A <br /> Page 2 <br /> capital cost and low maintenance over the life of the system when complaried to a package <br /> treatment system. Please refer to the article for details. <br /> The approach that Marselille and Anderson (2001)have taken has several advantages including <br /> simpler design,readily available carbon source in the sand to enhance denitrification, lower <br /> capital cost, and low maintenance in the long-term. <br /> The sand bed is contained within the trenches and acts like a intermediate sand filter design. <br /> Denitrification is promoted in an anaerobic environment in the bottom of the trenches. An initial <br /> target goal was set for nitrogen reduction of 50 to 60 percent within soils below the leach line <br /> trenches. Since our office will monitor the system for the first year including taking water meter <br /> readings, measuring actual denitrification, and influent concentrations, it will be possible to re- <br /> assess the nitrate loading of the site and if a buildup of nitrates in the ground water above 10- <br /> mgfL is occurring. <br /> The successful operation of the septic system will not only depend on the design factors <br /> discussed, but will also depend on the quality of the influent entering the system from the three <br /> buildings. The septic system is not designed to handle any other waste stream other than <br /> residential strength waste. Strong chemicals and solvents could seriously damage the septic <br /> system. Water softener brines are not acceptable, for disposal in the septic system. please call <br /> our office or ERD for more information regarding suitable waste streams. <br /> Calculating Flow Rates and Measuring Available Surge Volume <br /> Based on the results of the SS/NLS, the maximum peak use for the site is estimated to be <br /> approximately 2,108 gallons per day. This number was derived from 130 parking spaces (NOA, <br /> 2007). The average daily flow is estimated to be approximately 1,186 gallons per day(NOA, <br /> 2007). The septic system drain field was designed to handle 1,186 gallons per day with sufficient <br /> volume and disposal area in the pits to contain occasional peak flows at a rate of 2,108 gallons <br /> per day, <br /> The leach field adsorption area was determined by the following: <br /> Percolation rate (PR): 83 minutes per inch (mpi) (using slowest percolalion rate in shallow soil) <br /> Average daily_flow 1,186 gallons per day (gpd) <br /> Peakflow: 2,108 gallons per day (gpd) <br /> Loading Rate: <br /> Q (gpolsO = 5/(PR mpi)^0.5 (equation from Manual o . e tic Tank Practice <br /> Q == 5183^0.5 <br /> Q = 0.55 gpd/sf <br /> f <br /> C) 51Z_G <br />